Effect of well configuration in waterflooding projects
Su öteleme projelerinde kuyu yerleştirmelerinin önemi
- Tez No: 119042
- Danışmanlar: PROF. DR. SUAT BAĞCI
- Tez Türü: Yüksek Lisans
- Konular: Petrol ve Doğal Gaz Mühendisliği, Petroleum and Natural Gas Engineering
- Anahtar Kelimeler: SuEnjeksiyonu, Rezervuar Simülasyonu, Performans Tahmini, Yatay Kuyu vı, Benzetim, Kuyular, Rezervuarlar, Su enjeksiyonu, Waterflooding, Reservoir Simulation, Performance Prediction, Horizontal Producers IV ^'?^'^''?h:M, f$TAgtytrm Mosses, Simulation, Wells, Reservoirs, Water injection
- Yıl: 2002
- Dil: İngilizce
- Üniversite: Orta Doğu Teknik Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: Petrol ve Doğal Gaz Mühendisliği Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: Belirtilmemiş.
Özet
oz SU ÖTELEME PROJELERİNDE KUYU YERLEŞTİRMELERİNİN ÖNEMİ ÖKMEN, Yeşim Yüksek Lisans, Petrol ve Doğal Gaz Mühendisliği Bölümü Tez Yöneticisi: Prof. Dr. Suat Bağcı Aralık 2002, 177 sayfa EOR yöntemlerinin birçoğu, akışkanın (gaz ya da sıvı) rezervuara enjekte edilmesini içerir. Su ötelemesi, en yaygın EOR yöntemidir. Bu çalışmada,“K”sahasındaki su enjeksiyonu uygulaması değerlendirilmiştir. Bütün üretim, enjeksiyon ve basınç bilgilerinin toplanması sonrasında, gerekli açıklama ve yorumlar yapılmış, su enjeksiyonu performans analizi gerçekleştirilmiştir. Kuyu yerleştirmeleri ile beraber gelecek için petrol üretimi tahminleri yapılmıştır. Yeni kuyuların yerini belirlemek, rezervuar ve akışkan özelliklerine, kuyu ve yüzey şartlarına, ekonomik kriterlere bağlı olduğu için karmaşık bir problemdir. Bu problemi çözmek için çeşitli yaklaşımlar önerilebilir. Bu çalışmada operasyon stratejisi, rezervuar modellemesini esas alır çünkü sayısal modeller, rezervuar yönetiminde ayrıntılı ve güçlü tahminsel araçlardır. Bu amaç için, CMG'nin yeni nesil simülatörü IMEX kullanılmıştır. Bu çalışmanın bir amacı da 41 senedir üretimde olan rezervuarda simulator kullanarak tarihsel bir eşleştirme yapmaktır. IMEX simülatörü ile başarılı bir eşleştirme gerçekleştirilmiştir.Kuyu yerleştirmelerinin etkilerini görebilmek için beş farklı senaryo kullanılmıştır. Bunlar yeni kuyuların delinmesi, varolan kuyuların yatay kuyulara çevrilmesi ve bazı kuyuların su enjektörlerine çevrilmesi şeklinde uygulanmıştır. Bu senaryolar içinde en etkilisi varolan kuyuların yatay kuyulara çevrilmesi olmuştur. Yatay kuyuların kullanılması ile 5,114,000 varil (%20) ilave petrol elde edilmiştir.
Özet (Çeviri)
ABSTRACT EFFECT OF WELL CONFIGURATION IN W ATERFLOODING PROJECTS ÖKMEN, Yeşim M.Sc, Department of Petroleum and Natural Gas Engineering Supervisor: Prof. Dr. Suat Bağcı December 2002, 177 pages Most EOR processes involve the injection of a fluid (gas or liquid) into the reservoir. Waterflooding is the most widely applied EOR process among them. In this study, waterflooding project is evaluated in Field K. After obtaining all production, injection and pressure data and making necessary interpretations, water injection performance analysis were carried out. Performance prediction of oil production with well configurations was done. Determination of the location of new wells is a complex problem that depends on reservoir and fluid properties, well and surface specifications, and economic criteria. Various approaches have been proposed for this problem. The operating strategy for this project is based upon a reservoir simulation study as numerical models are detailed and powerful predictive tools in reservoir management. To reach this goal, a commercial simulator software (IMEX) that is the CMG's (Computer Modelling Group) new generation adoptive simulator was used. The one of the objective of this study was to obtain history matching of 41 year-old robust reservoir with simulation model. The simulation program m(IMEX) was able to history match for all of the parameters which resulted on satisfactory history match. Five scenarios were applied in this study to observe the effect of well configurations. These scenarios were performed as drilling of new vertical wells, converting of existing vertical wells to horizontal wells and converting some of the existing wells into water injectors. Using horizontal producers is the most efficient methods in all of the other scenarios. 5,114,000 bbls (20%) of additional oil recovery was achieved if horizontal producers were used.
Benzer Tezler
- Polymer augmented waterflooding in a reservoir with a bottom water zone
Alttan su tablalı rezervuarda polimer katkılı su enjeksiyonu
HOMAYOUN HODAİE
Yüksek Lisans
İngilizce
1992
Petrol ve Doğal Gaz MühendisliğiOrta Doğu Teknik ÜniversitesiDOÇ. DR. ALİ SUAT BAĞCI
- Experimental investigation of local scour patterns around hexagonally arrayed cylinder groups
Altıgen dizilimli silindir grupları etrafındaki yersel oyulma desenlerinin deneysel olarak araştırılması
IŞILSU YILDIRIM
Yüksek Lisans
İngilizce
2016
İnşaat Mühendisliğiİstanbul Teknik Üniversitesiİnşaat Mühendisliği Ana Bilim Dalı
DOÇ. DR. ORAL YAĞCI
- Isı borusu prensibinin güneşli su ısıtıcılarına ve damıtmaya uygulanması
Başlık çevirisi yok
ALİ YÜCEL UYAREL
- Effect of intersected wells configuration on productivity
Kesişen kuyular konfigürasyonunun verimlilik üzerine etkisi
AZAD ALMASOV
Yüksek Lisans
İngilizce
2017
Petrol ve Doğal Gaz Mühendisliğiİstanbul Teknik ÜniversitesiPetrol ve Doğal Gaz Mühendisliği Ana Bilim Dalı
DOÇ. DR. ÖMER İNANÇ TÜREYEN
- Effect of infill wall configurations on the behaviour of regular and irregular rc frames in elevation
Yükseklik boyunca düzenli ve düzensiz betonarme çerçevelerin davranışına dolgu duvar konfigürasyon-larının etkisi
ALAA QASIM RAHMAN RAHMAN
Yüksek Lisans
İngilizce
2017
İnşaat MühendisliğiGaziantep ÜniversitesiYapı Ana Bilim Dalı
Assoc. Prof. Dr. ESRA METE GÜNEYİSİ