Geri Dön

Operational comparison of flexible flow systems with conventional flow systems

Başlık çevirisi mevcut değil.

  1. Tez No: 8202
  2. Yazar: TANER BİLGİÇ
  3. Danışmanlar: DOÇ.DR. NESİM ERKİP
  4. Tez Türü: Yüksek Lisans
  5. Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
  6. Anahtar Kelimeler: Ekonomik kafile çizelgelemesi, esnek üretim sistemleri, esnek üretim hatları, otomasyon. Ana, Geleneksel üretim sistemleri, Üretim sistemleri, Economic Lot Scheduling, Flexible Manufacturing Systems, Flexible Flow Lines, Justification of Automation. m, Traditional production systems, Production systems
  7. Yıl: 1990
  8. Dil: İngilizce
  9. Üniversite: Orta Doğu Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

ÖZET ESNEK ÜRETİM SİSTEMLERİNİN GELENEKSEL ÜRETİM SİSTEMLERİ İLE KARŞILAŞTIRILMASI BİLGİÇ, Taner Yüksek Lisans Tezi, End. Müh. Bölümü Tez Yöneticisi : Doç. Dr. Nesim ERKİP Ocak 1990, 99 sayfa Bu çalışma, esnek üretim hatlarının geleneksel üretim hatlarıyla çok ürünlü ve sabit talepli bir ortamda karşılaştırılması için bir yöntem önermektedir. Üretim sistemlerinde ürünlerin hazırlama zamanlan olduğu ve tek bir yöne doğru seri akış halinde oldukları kabul edilmiştir. Problem önce tek makinalı bir problem olarak formüle edilmiştir. Alt ve üst sınırlar sunulduktan ve 4 ürünlü bir sistemin olurluluk problemini çözen bir yöntem önerildikten sonra tek makinalı üretim sistemlerinin çalışma maliyetlerini yaklaşık olarak bulan bir algoritma önerilmiştir. Bu algoritma kullanılarak, bir esnek makina, iki geleneksel makina ile karşılaştırılmıştır. Önerilen algoritma çok makinalı üretim sistemlerinin çalışma maliyetini bulacak şekilde geliştirilmiş ve esnek bir üretim hattı, geleneksel iki hat ile karşılaştırılmıştır Sistemin çalışmasına yönelik kararların böyle bir karşılaştırmada en önemli faktörler olduğu gösterilmiştir.

Özet (Çeviri)

ABSTRACT OPERATIONAL COMPARISON OF FLEXIBLE FLOW SYSTEMS WITH CONVENTIONAL FLOW SYSTEMS BÎLGÎÇ, Taner M.S. in Industrial Engineering Supervisor : Assoc. Prof. Dr. Nesim Erkip January 1990, 99 pages The study provides a methodology for comparing an automated production sytsem with a non-automated, conventional production system under constant and deterministic demand in a multi-product environment The production systems are assumed to be flow lines in which there exists setup times and a unidirectional flow of items. The problem is first formulated as a single stage problem. After presenting upper and lower bounds and a way to perform complete feasibility check, a heuristic procedure is proposed to find the operating cost of the single stage, four-product economic lot scheduling problem. Then an automated machine is experimentally compared with two non-automated machines. Multi-stage problem is formulated and the heuristic proposed to solve single-stage problems is extended to solve two-stage problems. A flexible flow line is then compared with two conventional flow lines. It is shown that operational issues are very important in comparing conventional systems with automated systems.

Benzer Tezler

  1. Esnek üretim sistemlerinin tasarımı ve çizelgelemesi

    Design and scheduling of flexible manufacturing systems

    AHMET MURAT PORAY

    Yüksek Lisans

    Türkçe

    Türkçe

    1995

    Endüstri ve Endüstri Mühendisliğiİstanbul Teknik Üniversitesi

    DOÇ.DR. M. BÜLENT DURMUŞOĞLU

  2. İnşaat firmalarında bilgi yönetimi

    Başlık çevirisi yok

    AHMET ALTUNBAŞ

    Yüksek Lisans

    Türkçe

    Türkçe

    1998

    Mimarlıkİstanbul Teknik Üniversitesi

    Bina Yapım Yönetimi Bilim Dalı

    PROF. DR. YILDIZ SEY

  3. Basınçlı su reaktörleri U borulu buhar üreteçlerinin termo-hidrolik modellenmesi

    Thermal-hydraulic analysis of U-tube steam generators for gressurized water reactors

    SÜLEYMAN ÖZKAYNAK

    Doktora

    Türkçe

    Türkçe

    1991

    Nükleer Mühendislikİstanbul Teknik Üniversitesi

    PROF.DR. HASBİ YAVUZ

  4. Filo planlaması

    Fleet planning

    SIDIKA MUŞ

    Yüksek Lisans

    Türkçe

    Türkçe

    1992

    Ulaşımİstanbul Teknik Üniversitesi

    DOÇ. DR. MEHMET TANYAŞ

  5. Üretim kaynakları planlaması (MRP II) ve yan sanayi maliyet analizi ve kontrolü sistemi

    Manufacturing resources planning (MRPII) and vendor firms cost analysis and control system

    SERKAN SANCAN

    Yüksek Lisans

    Türkçe

    Türkçe

    1997

    Endüstri ve Endüstri Mühendisliğiİstanbul Teknik Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    DOÇ. DR. TUFAN VEHBİ KOÇ