Geri Dön

Kazı ve hafriyat işlerinde uygulanan risk değerlendirme yöntemlerinin karşılaştırılması

Comparison of risk assessment methods used inexcavation and excavation works

  1. Tez No: 719525
  2. Yazar: ÖMER MİNAZ
  3. Danışmanlar: PROF. DR. BEYRUL CANBAZ
  4. Tez Türü: Yüksek Lisans
  5. Konular: Çalışma Ekonomisi ve Endüstri İlişkileri, Labour Economics and Industrial Relations
  6. Anahtar Kelimeler: Hafriyat, Kazı çalışmaları, Risk değerlendirmesi, Risk faktörleri, İş güvenliği, İş kazaları, İş sağlığı, Excavation, Excavation applicability, Risk assesment, Risk factors, Work safety, Occupational accidents, Occupational health
  7. Yıl: 2021
  8. Dil: Türkçe
  9. Üniversite: İstanbul Yeni Yüzyıl Üniversitesi
  10. Enstitü: Sağlık Bilimleri Enstitüsü
  11. Ana Bilim Dalı: İş Sağlığı ve Güvenliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

İş kazalarının birçok faktörün değişik oranlardaki paylarının etkilenişi ile meydana geldiği kanısı kuvvet bulmaktadır. O halde, kazaları önleme hususunda yapılacak çalışmalarda, konuyla ilgili elde edilebilecek bütün faktörleri birlikte analiz ederek, kaza üreten unsurlar hakkında yönetimi uyaran, bu şekilde erken önlem alınmasına olanak sağlayan yeni teknikler geliştirilmelidir. İş kazalarının önlenmesi için devlet, işveren ve çalışanın bir arada sorumluluklarını yerine getirmesi gerekmektedir. İşveren ve çalışanların iş güvenliği bilincini kazanarak iş kazaları ve meslek hastalıklarının önüne geçilebilir. Kazı ve hafriyat işleri özelinde yapılan çalışma çalışan sağlığı ve iş güvenliğinin önemini vurgulamaktadır. Yapılan risk değerlendirme çalışmaları ile riskler belirlenmiş olup alınabilecek önlemlerle sektörde ve genel anlamda iş sağlığı ve güvenliği farkındalığının arttırılması amaçlanmaktadır. Yapılan ve yapılacak olan düzenlemeler iyileştirmelerle iş sağlığı ve güvenliğindeki bazı sorunların tamamen ortadan kaldırılması mümkün görünmese de iş kazalarını azaltabilmektedir. Riskler belirlenmiş ve bu risklere bazı öneriler getirilmiştir. Alınacak önlemlerle riskler azaltılabilir veya ortadan kaldırılabilmektedir. Çalışma alanı ve faaliyetlerine göre tehlike ve riskler analiz edilmiştir. Risk değerlendirme metotlarının uygunluğu ve etkinliğini karşılaştırmak için üç yöntem seçilmiştir. 5x5 Matris metodu, Fine- Kinney metodu ve FMEA metodu ile hazırlanan rapor sonuçlarına göre değerlendirme yapılmıştır.

Özet (Çeviri)

Occupational accidents are strongly believed to occur by the influence of many factors at different rates. Then, new techniques should be developed in the studies which are about the prevention of accidents, by analyzing all the factors that can be obtained about the subject, warning the management about the factors causing the accident, thus allowing early preventions to be taken. The government, employers and employees must do their responsibilities together in order to prevent occupational accidents. Occupational accidents and occupational diseases can be prevented with the help of occupational safety awareness of employees and employers. The work carried out specifically for excavation and earthworks emphasizes the importance of employee health and safety. With the risk assessment studies, the risks have been determined and it is aimed to increase the awareness of occupational health and safety in the sector and in general with the measures that can be taken. Although it is not possible to completely eliminate some problems in occupational health and safety with improvements, the arrangements made or to be made can reduce occupational accidents. Risks have been identified and some suggestions have been made for these risks. Risks can be reduced or reduced with the preventions to be taken. According to the work area and activities, dangers and risks were analyzed.Three methods were chosen to compare the suitability and effectiveness of risk assessment methods.The report's results were evaluated using the 5x5 Matrix method, the Fine-Kinney method, and the FMEA method.

Benzer Tezler

  1. Studies on the cuttability of rocks at O.A.L. Çayırhan district by laboratory cutting tests

    Başlık çevirisi yok

    KÜRŞAD CEYLAN

    Yüksek Lisans

    İngilizce

    İngilizce

    1987

    Maden Mühendisliği ve MadencilikOrta Doğu Teknik Üniversitesi

    Maden Mühendisliği Ana Bilim Dalı

    DOÇ. DR. NACİ BÖLÜKBAŞI

  2. Ankara Kızılcahamam Kınık Tüneli'ndeki jeoteknik problemler

    Investigation of the geotecnical problems the Kınık Tunnel, Kızılcahamam Ankara

    RIZA MUCUKGİL

    Yüksek Lisans

    Türkçe

    Türkçe

    1987

    Jeoloji MühendisliğiAnkara Üniversitesi

    Jeoloji Mühendisliği Ana Bilim Dalı

    YRD. DOÇ. DR. ERGUN GÖKTEN

  3. Tabanköy (Yenice-Çanakkale) dolayının jeolojisi ve demir etüdü

    Başlık çevirisi yok

    ALİ RIZA BAĞLI

    Yüksek Lisans

    Türkçe

    Türkçe

    1984

    Jeoloji Mühendisliğiİstanbul Üniversitesi

    Genel Jeoloji Ana Bilim Dalı

    DOÇ. DR. ERDİNÇ KİPMAN

  4. Van - Dilkaya Höyüğü 1984 - 1986 kazı dönemlerinde ele geçen Erken Transkafkasya çanak çömleği

    Başlık çevirisi yok

    GÜLRİZ KOZBE

    Doktora

    Türkçe

    Türkçe

    1987

    ArkeolojiEge Üniversitesi

    Klasik Arkeoloji Ana Bilim Dalı

    DOÇ. DR. ALTAN ÇİLİNGİROĞLU

  5. Türkiye Taşkömürü Kurumu Armutçuluk Taşkömürü İşletme Müessesesi yeraltı ocaklarında yüksek basınçlı su jetleriyle kömür kazısının araştırılması ve uygulanabilirliği

    The Investigation of coal excavation with high-pressure water jets and its applicability to the underground mines of Armutçuk hardcoal company of Turkish hardcoal enterprise

    NURİ ALİ AKÇIN

    Doktora

    Türkçe

    Türkçe

    1986

    Maden Mühendisliği ve Madencilikİstanbul Teknik Üniversitesi

    PROF. DR. ŞİNASİ ESKİKAYA