Geri Dön

Bayındırlık işleri birim fiyat analizindeki işgücü ve makine gücü verimliliklerinin irdelenmesi

The Examination of the productivity of work power and machine power in unit price analyses of ministry of public works and settlements

  1. Tez No: 95602
  2. Yazar: ALİ TAT
  3. Danışmanlar: DOÇ. DR. M. EMİN ÖCAL
  4. Tez Türü: Yüksek Lisans
  5. Konular: İnşaat Mühendisliği, Civil Engineering
  6. Anahtar Kelimeler: iş gücü, makine gücü, iş ölçümü, birim fiyat analizi, Bayındırlık ve İskan Bakanlığı, Birim fiyat, İş verimi, Work Power Measure, Machine Power, Unit Price Analyses, Work Measure. n, Ministry of Public Works and Settlement, Unit price, Manpower, Work efficiency, Work measurement
  7. Yıl: 2000
  8. Dil: Türkçe
  9. Üniversite: Çukurova Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: İnşaat Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

öz YÜKSEK LİSANS TEZİ BAYINDIRLIK İŞLERİ BİRİM FİYAT ANALİZLERİNDEKİ İŞGÜCÜ VE MAKİNE GÜCÜ VERİMLİLİKLERİNİN İRDELENMESİ Ali TAT ÇUKUROVA ÜNİVERSİTESİ FEN BİLİMLERİ ENSTİTÜSÜ İNŞAAT MÜHENDİSLİĞİ ANA BİLİM DALİ Danışman : Doç. Dr. M. Emin. ÖCAL Jüri : Doç. Dr. M. Emin. ÖCAL : Doç. Dr. Mustafa LAMAN : Yrd. Doç. Dr. S.Seren AKAVCI İnşaat fâaliyetlerinin planlanması ve kontrol aşamalarında etkinliği arttırmak için projede kullanılacak iş gücü miktarlarının bilinmesinin önemi büyüktür. Ülkemizde kamu inşaatlarının planlanması ve ihaleye esas ön keşiflerinin hazırlanmasında Bayındırlık ve İskân Bakanlığı Birim Fiyat Analizlerindeki iş gücü süreleri baz alınmaktadır. Bu çalışmada Bayındırlık ve İskân Bakanlığı Birim Fiyat Analizlerinden seçilen 19 adet iş kalemine ait işçilik-saat ve makine-saat sureleri uygulama koşullarındaki düzeyi belirlenmiş ve bu süreler, Bayındırlık ve İskan Bakanlığı Analizlerindeki aynı poza ait sürelerle kıyaslanmıştır.

Özet (Çeviri)

ABSTRACT MSc THESIS THE EXAMINATION OF THE PRODUCTIVITY OF WORK POWER AND MACHINE POWER IN UNIT PRICE ANALYSES OF MINISTRY OF PUBLIC WORKS AND SETTLEMENTS Ali TAT UNIVERSITY OF ÇUKUROVA DEPARTMENT OF CIVIL ENGINEERING Adviser : Doç. Dr. M. Emin. ÖCAL Jury : Doç. Dr. M. Emin. ÖCAL : Doç. Dr. Mustafa LAMAN : Yrd. Doç. Dr. S. Seren AKAVCI It is very important to know, the quantity of work power that will be used in project for planning activities and activing control levels. In our country, work power periods in unit price analyses of Ministry of Public Works And Settlement are used for preparing foremost valuation on the base of adjudication and planning public buildings. In this study, the level of work-hour periods of application conditions that belongs to nineteen work measure, chosen from Unit Price Analyses of Ministry of Public Works and Settlement has been determined and these periods belonging to the pose that is the same with that of ministry of public works and settlement analyses.

Benzer Tezler

  1. Konut binalarında imalat girdileri, imalat ve imalat grupları bazında maliyet ve miktar analizleri

    Cost and quantity analysis on the basis of manufacturing, manufacturing groups and manufacturing inputs in residential buildings

    NİLAY ELÇİ

    Yüksek Lisans

    Türkçe

    Türkçe

    1999

    Mimarlıkİstanbul Teknik Üniversitesi

    Mimarlık Ana Bilim Dalı

    DOÇ. DR. AHMET MURAT ÇIRACI

  2. Bilgisayar destekli yapı tasarım sisteminin malzeme ve maliyet yazılımı

    Başlık çevirisi yok

    ZERRİN İNEL

    Yüksek Lisans

    Türkçe

    Türkçe

    1990

    Bilgisayar Mühendisliği Bilimleri-Bilgisayar ve KontrolEge Üniversitesi

    Bilgisayar Bilimleri Ana Bilim Dalı

    PROF. DR. EMRAH ORHUN

  3. İşgrubu birim fiat ile bir arıtma tesisi ihalesi

    Başlık çevirisi yok

    GÖKHAN GÜNEŞ

    Yüksek Lisans

    Türkçe

    Türkçe

    1998

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    PROF. DR. DOĞAN SORGUÇ