Yeni Çeltek yeraltı kömür ocağında taban yolu duraylılığının ayak ilerlemesine bağlı olarak incelenmesi
An Investigation into the gateroad stability with respect to face advance at Yeni Çeltek underground coal mine
- Tez No: 84203
- Danışmanlar: PROF. DR. OSMAN ZEKİ HEKİMOĞLU
- Tez Türü: Yüksek Lisans
- Konular: Maden Mühendisliği ve Madencilik, Mining Engineering and Mining
- Anahtar Kelimeler: Kararlılık, Kömür, Kömür işletmeleri, Kömür ocakları, Taban yolu, Stability, Coal, Coal enterprises, Coal mines, Bottom road
- Yıl: 1999
- Dil: Türkçe
- Üniversite: Hacettepe Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: Maden Mühendisliği Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: Belirtilmemiş.
Özet
IV ÖZET Kömür üretiminde uzunayaklardaki taban yolu duraylılığı büyük önem taşımaktadır. Duraysız taban yollan, kömür üretiminde büyük olumsuzluklara yol açmaktadır. Bu nedenle kömür madenlerinde yapılacak uzunayak tasarımlarında taban yolu duraylılığının gözetilmesi gerekmektedir. Yeni Çeltek Kömür Madeni Küçükköhne Yeraltı Kömür İşletmesinde, taban yollarındaki kapanma problemlerinden dolayı, kömür üretiminde büyük aksamalar görülmektedir. Bu tez kapsamında, adı geçen madende seçilen bir taban yolu ayak ilerlemesine bağlı olarak incelenmiştir. Yapılan ölçümler sonucunda taban yolundaki kapanmaların ayak önünden yaklaşık 3 Om lik bir mesafeden itibaren başladığı gözlenmiştir. Taban yolu tahkimatına etkiyen basıncın da bu mesafeden itibaren yükselmeye başladığı ve yaklaşık 30 MPa da en yüksek değerine ulaştığı gözlenmiştir. Bu ocaktaki taban yolu duraylılığının arttırılması için esnek tahkimat sistemi (kayan tip) kullanılmasının uygun olabileceği konusunda öneri getirilmiştir. Ayrıca İşletmenin içinde bulunduğu mevcut koşullarının belirlenmesine çalışılmıştır.
Özet (Çeviri)
ABSTRACT Stability of gateroads in longwall mining is of paramount importance for coal winning operations. Unstable gateroads have long been established to be the main reason for inefficient production operations. It is therefore very important to pay utmost care for gateroad stability when designing longwall coal mines. Yeni Çeltek Coal Mining Establishment has long been known to suffer drawbacks arising from instable gateroads, since the production operations in the mine have been halted by considerable gateroad closures. A comprehensive study was carried out in this mine in an effort to investigate the stability of gateroads. The measurements showed that the gateroads start to exhibit closures about a distance 30 m outby the face line. The pressure exerted on the gateroad support was also seen to rice at this point, reaching to a maximum value of around 30 MPa at the face line. The use of yield-type girder support was then recommended for increased stability in this mine.
Benzer Tezler
- Development of a new pull-out testing system for rock bolts
Kaya saplamaları için yeni bir çekme testi sistemi geliştirilmesi
ERDİL TAŞEL
Yüksek Lisans
İngilizce
1999
Maden Mühendisliği ve MadencilikOrta Doğu Teknik ÜniversitesiMaden Mühendisliği Ana Bilim Dalı
DOÇ. DR. ERDAL ÜNAL
- Yeni çeltek işletmesi Bolu ocağında taban yollarında oluşan konverjansların incelenmesi
Başlık çevirisi yok
MEHMET ALİ KARGI
Yüksek Lisans
Türkçe
1995
Maden Mühendisliği ve MadencilikHacettepe ÜniversitesiY.DOÇ.DR. BAHTİYAR ÜNVER
- Yeni Çeltek Linyit Ocağı havalandırma sisteminin etüdü
The Research of Yeni Çeltek Colliery ventilation system
NAİL AŞIK
Yüksek Lisans
Türkçe
1993
Maden Mühendisliği ve Madencilikİstanbul Teknik ÜniversitesiPROF.DR. ERDİL AYVAZOĞLU
- Sorgun (Yozgat) kömürlerinin kimyasal ve petrografik özelliklerinin incelenmesi
Başlık çevirisi yok
EMİNE CİCİOĞLU