Loading policies in flexible manufacturing systems: A comparative study
Başlık çevirisi mevcut değil.
- Tez No: 8204
- Danışmanlar: DOÇ. DR. NESİM ERKİP
- Tez Türü: Yüksek Lisans
- Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
- Anahtar Kelimeler: Esnek İmalat Sistemleri^ Yükleme Politikalan, Benzetim, :M Çekme Sistemleri, Esnek üretim sistemleri, Yükleme politikaları, Çekme sistemleri, Flexible Manufacturing Systems, Loading Policies, Simulation, Pull Systems. rn, Pull systems
- Yıl: 1990
- Dil: İngilizce
- Üniversite: Orta Doğu Teknik Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: Belirtilmemiş.
Özet
ÖZET ESNEK ÜRETÎM SİSTEMLERİ ÎÇÎN YÜKLEME POLİTİKALARI : BÎR KARŞILAŞTIRMA DENEMESİ TUNAŞAR, Cenk Yüksek Lisans Tezi, End. Müh. Bölümü Tez Yöneticisi : Doç. Dr. Nesim ERKİP Şubat 1990, 100 sayfa Bu çalışma Esnek İmalat Sistemleri için değişik yükleme politikalarını karşılaştırmaktadır. Sistem, birçok iş istasyonlarını birleştiren bir konveyör içermekte ve bir endüstriyel robot konveyörde mevcut parçaları işlenmek üzere ilgili istasyonlara yüklemektedir. İş istasyonları sonlu sayıda ara envanter tutabilmektedir. İş istasyonları, işleyecekleri parçalan ara envanter biriktirme bölgesinden çekip işlemektedir. Robot ise gerekli parçalan konveyörden çekmekte ve bekleyen istasyona yüklemektedir. Bu sistemin, temel yükleme politikalarından olan En Kısa Kuyruk Önceliğine, Yüksek Boş Zaman Değer Önceliğine ve Markov Süreçler bazlı bir yükleme politikasına olan performansı incelenmiştir. Sistemin kısa dönem analizi bir benzetim modeli ile yapılmıştır. Benzetim modeli sayesinde yükleme politikalan karşılaştırılrnıştır.
Özet (Çeviri)
ABSTRACT LOADING POLICIES IN FLEXIBLE MANUFACTURING SYSTEMS A COMPARATIVE STUDY TUNAŞAR, Cenk M.S. in Industrial Engineering Supervisor : Assoc. Prof. Dr Nesim Erkip February 1990, 100 pages The study compares different loading control policies for a Flexible Manufacturing System. The system is composed of a recirculating conveyor that links several work stations. An industrial robot unloads parts from the conveyor and loads to the designated work station. A pull structure exists as work stations pull parts from their local input buffers which have finite capacity. Similarly, robot picks parts from the conveyor. Hence the performance measure which is a cost charged to work station idle times is a function of robot loading policy to the work stations and the sequence of parts on the conveyor. The basic loading rules of Shortest Queue, Largest Penalty and a rule based on semi-Markov decision process are compared under different modeling and system environments. Transient behaviour of this system is analyzed via simulation. Experiments comparing the rules are presented.
Benzer Tezler
- İmalat kaynakları planlaması
Manufacturing resource planning (MRP II)
ERCAN CİNGÖZ
Yüksek Lisans
Türkçe
1993
Endüstri ve Endüstri Mühendisliğiİstanbul Teknik ÜniversitesiPROF.DR. ATAÇ SOYSAL
- İmalat sistemlerinin tasarlanması ve öncelik kurallarının belirlenmesinde yapay sinir ağlarının kullanılması
<the use of neural networks in determination of the manufacturing systems design and dispatching rules
TARIK ÇAKAR
Doktora
Türkçe
1997
İşletmeİstanbul Teknik Üniversitesiİşletme Mühendisliği Ana Bilim Dalı
PROF. DR. AYHAN TORAMAN
- Döviz kurunu belirleyen faktörler ve kur riski
Determination of foreign exchange rates and foreign exchange risk
MEHMET COŞKUN ÖZAVNİK
- Özelleştirme ve Türkiye uygulamaları
Evaluation of implementations of privatization policies in Turkey
HÜLYA BERK
- Türkiye'de yabancı sermaye (1980-1995 döneminin bir değerlendirilmesi)
Foreign capital investments in Turkey (The eveluation of the period between 1980-1995)
İSMET SALİHOĞLU