A solution approach for the distributed no-idle flowshop scheduling problem with due windows

Zaman pencereli dağıtık beklemesiz akış tipi çizelgeleme problemi için bir çözüm yaklaşımı

  1. Tez No: 792167
  2. Yazar: KASRA MOUSIGHICHI
  3. Danışmanlar: DOÇ. DR. MUALLA GONCA AVCI
  4. Tez Türü: Yüksek Lisans
  5. Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
  6. Anahtar Kelimeler: Matematiksel modeller, Performans analizi, Permütasyon, Zaman pencereleri, Çizelgeleme, Mathematical models, Performance analysis, Permutation, Time windows, Scheduling
  7. Yıl: 2023
  8. Dil: İngilizce
  9. Üniversite: Dokuz Eylül Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Bu çalışma dağıtık permütasyon akış tipi çizelgeleme probleminin boşta olmama ve zaman penceresi kısıtları ile genişletilmiş bir halini dikkate almaktadır. Zaman Pencereli Dağıtık Beklemesiz Akış Tipi Çizelgeleme Problemi (ZPDBATÇP), bir fabrika kümesinde işlenecek bir dizi işi içerir. ZPDBATÇP'nin amacı, toplam ağırlıklı erken tamamlanma ve gecikme cezalarını minimum kılacak iş-fabrika atamalarını ve her fabrikadaki iş sıralamalarını belirlemektir. ZPDBATÇP, ayar işlemlerinin çok pahalı olduğu ve makineleri durdurup yeniden çalıştırmanın maliyet açısından etkin olmadığı sektörlerle ilgilidir. Bu nedenle, bir makinede birbirini izleyen iki iş arasındaki herhangi bir boş zamana izin verilmemektedir. Ek olarak, her iş, en erken ve en geç tamamlanma zamanlarını gösteren bir zaman penceresiyle ilişkilendirilir. İlgili literatürde, bilgimiz dahilinde ZPDBATÇP için matematiksel bir formülasyon veya çözüm yaklaşımı öneren herhangi bir çalışma bulunmamaktadır. Bu tezde, ZPDBATÇP için üç matematiksel formülasyon geliştirilmiştir. Ayrıca, büyük boyutlu ZPDBATÇP örneklerini çözmek için bir hibrit yinelemeli açgözlü-tabu arama algoritması (HYA-TA) önerilmiştir. Hesaplamalı çalışmada, önerilen matematiksel modellerin performansları analiz edilmiştir. HYA-TA'nın bileşenlerini analiz etmek için kapsamlı sayısal deneyler yapılmıştır. Ayrıca, HYA-TA'nın performansı, temel bir yerel aramalı yinelemeli açgözlü algoritmanın (HYA-YA) performansı ile karşılaştırılmıştır. Hesaplamalı çalışmanın sonuçları, önerilen HYA-TA'nın ZPDBATÇP'nin çözümündeki etkinliğini göstermektedir.

Özet (Çeviri)

This study addresses an extension of the Distributed Permutation Flowshop Scheduling Problem with no-idle and due window constraints. The Distributed No-idle Flowshop Scheduling Problem with Due Windows (DNIFSPDW) involves a set of jobs to be processed in a set of factories. The aim of the DNIFSPDW is to determine the job assignments to the factories and the job sequences in each factory that provide the minimum total weighted earliness and tardiness (TWET) penalties. The DNIFSPDW concerns the industries where setup operations are so expensive that reactivating the machines is not cost-effective. Therefore, any idle time between two consecutive jobs on a machine is prohibited. In addition, each job is associated with a due window indicating its earliest and latest completion times. In the related literature, there exists no study that proposes a mathematical formulation or a solution approach for DNIFSPDW to the best of our knowledge. In this thesis, three mathematical formulations are developed for the DNIFSPDW. Moreover, a hybrid iterated greedy-tabu search algorithm (IG-TS) is proposed to solve large-size DNIFSPDW instances. In the computational study, the performances of the proposed mathematical models were analyzed. Additionally, extensive numerical experiments were conducted to evaluate the components of IG-TS. Furthermore, the performance of IG-TS was compared with that of a basic iterated greedy algorithm with a local search (IG-LS). The results of the computational study indicate the effectiveness of the proposed IG-TS in solving the DNIFSPDW.

Benzer Tezler

  1. Dağıtılmış permütasyon akış tipi atölye çizelgeleme problemleri

    Distributed permutation flowshop scheduling problems

    MÜNEVVER GÜNAY VAN

    Doktora

    Türkçe

    Türkçe

    2025

    İstatistikVan Yüzüncü Yıl Üniversitesi

    İstatistik Ana Bilim Dalı

    DOÇ. DR. ALPER HAMZADAYI

  2. Yüzey kurma probleminin transputer tabanlı sistemlerde paralel çözümü

    Başlık çevirisi yok

    ZİYA MERT GÜRAY

    Yüksek Lisans

    Türkçe

    Türkçe

    1998

    Bilgisayar Mühendisliği Bilimleri-Bilgisayar ve Kontrolİstanbul Teknik Üniversitesi

    Bilgisayar Mühendisliği Ana Bilim Dalı

    YRD. DOÇ. DR. COŞKUN SÖNMEZ

  3. Bazı kuyruk modellerinde maliyet analizi ve simülasyonun rolü

    The Cost analysis of some qeueing problems and the role of simülation in their solutions

    BEKİR YILDIRIM

    Doktora

    Türkçe

    Türkçe

    1989

    İstatistikİstanbul Teknik Üniversitesi

    DOÇ.DR. CEVDET CERİT

  4. A software-defined networking approach for wireless systems

    Kablosuz ağlar için bir yazılıma dayalı ağ yaklaşımı

    VOLKAN YAZICI

    Doktora

    İngilizce

    İngilizce

    2015

    Bilgisayar Mühendisliği Bilimleri-Bilgisayar ve KontrolÖzyeğin Üniversitesi

    Bilgisayar Mühendisliği Ana Bilim Dalı

    DOÇ. DR. MEHMET OĞUZ SUNAY

  5. Düzgün yayılı yük etkisindeki betonarme plakların sonlu elemanlar yöntemi ile doğrusal olmayan hesabı

    Finite elements method for the non-linear analysis of reinforced concrete plates subjected to uniformly distributed loads

    KUTLU DARILMAZ

    Yüksek Lisans

    Türkçe

    Türkçe

    1997

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    Yapı Ana Bilim Dalı

    PROF. DR. NAHİT KUMBASAR