Geri Dön

Taahhütler altında proje planlaması için dinamik karar verme modeli yaklaşımı

Dynamic decision model approach for project planning under commitments

  1. Tez No: 758974
  2. Yazar: ÖZGE DEMİR ÖZCAN
  3. Danışmanlar: DR. ÖĞR. ÜYESİ BANU YÜKSEL ÖZKAYA
  4. Tez Türü: Yüksek Lisans
  5. Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
  6. Anahtar Kelimeler: Dinamik programlama, Markov karar süreçleri, Proje planlama, Sezgisel yaklaşım, Taahhüt, Dynamic programming, Markov decision processes, Project planning, Intuitive approach, Undertaking
  7. Yıl: 2022
  8. Dil: Türkçe
  9. Üniversite: Hacettepe Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Farklı alanlarda faaliyet gösteren bir çok şirket imzaladıkları sözleşmeler için çeşitli projeler yürütmektedir. Bu sözleşmeler ile firmalar bazı taahhütlerde bulunmakta olup gerçekleştirilememesi durumunda ceza ve yaptırımlar ile karşılaşmaktadır. Bu sebeple, sözleşme doğrultusunda yerine getirilmesi gereken taahhüt için kısıtlı zaman, bütçe ve kaynaklar ile projelerin dinamik bir şekilde planlanmasına ve yönetilmesine ihtiyaç duyulmaktadır. Çalışma kapsamında, zaman taahhüdünün dikkate alındığı Markov Karar Süreci modeli ve sezgisel yaklaşım önerilmiştir. Projede çalışanların bilgilerinden yararlanılarak seri ve paralel bağlı aktivitelerin gerçekleşebileceği minimum ve maksimum iş yükleri gerçeğe yakın olarak belirlenmektedir. Kritik yol yöntemi ile projenin tamamlanacağı en uzun süre hesaplanmaktadır. Model, maksimum iş yükü için gerçekleşecek en uzun süreden geriye doğru minimizasyon problemi olarak çözülerek projenin tamamlanacağı en iyi ortalama süre bulunmaktadır. Modelin dinamik olarak planlanması zorlaşmaktadır. Bu nedenle, aktivite ilerlemelerinin planlanan aktivite süreleri ile belirli bir algoritma sayesinde karşılaştırıldığı ve alınacak aksiyona karar verilen bir karar kuralı geliştirilmiştir. Oluşturulan karar kuralı ile model farklılaştırılmış ve sezgisel bir model önerilmiştir. Zaman taahhüdü dolayısıyla proje başında sözleşmede taahhüt edilen süre dikkate alınmıştır. Sezgisel model ile başlangıçta taahhüt edilen proje süresine daha yakın gerçekleşmelerin oluşması sağlanmıştır. Ayrıca, her periyotta alınacak aksiyon belirlendiği için oluşan işlem yükü azalmıştır. Oluşturulan modeller farklı proje ağları için çözdürülmüştür. Aktivite bağlantılarına ve büyüklüklerine göre projeler için kullanılması uygun olan modellere ve parametrelere değinilmiştir. Markov karar modeli ile sezgisel modelin sonuçları arasındaki kıyaslama sayesinde kısıt değerlerinde ve parametrelerde güncelleme yapılabilmiştir. İşlem yükünü daha da azaltmak için projelerin iş paketlerine ayrılarak planlanması ve yürütülmesi önerilmiştir.

Özet (Çeviri)

Many companies carry out various projects for the contracts they. Companies make some commitments with these contracts. If these commitments are not fulfilled, penalties occur. In order to fulfill the conditions required by the contract, projects must be dynamically planned and managed with limited time, budget and resources. Time commitment has been considered within the scope of the study and Markov decision process model and heuristic approach are proposed. The minimum and maximum workloads of the activities are determined close to reality by utilizing the knowledge of the employees in the project. The longest time is calculated by the critical path method. The model optimizes the average longest time for the project by using minimization function and finds the average best time. It becomes difficult to plan dynamically. The progress of the activities and their planned durations were compared with a certain algorithm and a decision rule was developed in which the action to be taken was decided. By using the decision rule, the model is differentiated and a heuristic model is created. Due to the time commitment, the time promised in the contract at the beginning of the project was taken into account. The created models were solved for different project networks. By comparing the results of the Markov decision model and the heuristic model, the constraint values and parameters in the models can be updated. In order to reduce the processing load, it has been proposed to divide the projects into work packages.

Benzer Tezler

  1. Utilization of catboost algorithm to enhance investment and bidding strategy in the construction industry

    Nşaat sektöründe yatırım ve ihale stratejisini geliştirmek için catboost algoritmasının kullanılması

    FILIPP LIGAY

    Yüksek Lisans

    İngilizce

    İngilizce

    2026

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    DOÇ. DR. ONUR BEHZAT TOKDEMİR

  2. Yeni ekonomi, dinamikleri, etkileri, araçları bu çerçevede Türkiye örneği

    New economy, its dynamics and tools, and in this cope, Turkey

    GENCAY COŞKUN

    Yüksek Lisans

    Türkçe

    Türkçe

    2005

    EkonomiMarmara Üniversitesi

    İktisat Ana Bilim Dalı

    YRD. DOÇ. DR. SUAT YAVUZ

  3. Energy operations management for renewable power producers in electricity markets

    Elektrik piyasalarında yenilenebilir enerji üreticileri için enerji operasyonları yönetimi

    ECE ÇİĞDEM KARAKOYUN

    Doktora

    İngilizce

    İngilizce

    2023

    Endüstri ve Endüstri Mühendisliğiİhsan Doğramacı Bilkent Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    DOÇ. DR. AYŞE SELİN KOCAMAN

    DR. ÖĞR. ÜYESİ EMRE NADAR

  4. İnşaat endüstrisinde çok amaçlı karar verme ile yatırım kararları

    Multi-purpose decision making and investment decisions in the construction industry

    AHMET SUNGURBEYLİ

    Yüksek Lisans

    Türkçe

    Türkçe

    2022

    Endüstri ve Endüstri MühendisliğiHaliç Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    DR. ÖĞR. ÜYESİ ÇAĞRI ÖZGÜN KİBİROĞLU

  5. Tacir bakımından ücret ve sözleşme cezasının indirilmesini isteyememe

    Inability to request reduction of wages and contractual penalties for the merchant

    MEHMET SABAN

    Yüksek Lisans

    Türkçe

    Türkçe

    2025

    HukukAnkara Hacı Bayram Veli Üniversitesi

    Özel Hukuk Ana Bilim Dalı

    PROF. DR. HAYRETTİN ÇAĞLAR