Geri Dön

Strategical planning and feasibility study on underground gas storage for Ankara

Ankara için yeraltı gaz depolaması stratejik planlama ve fizibilite çalışması

  1. Tez No: 75842
  2. Yazar: EMRAH ÖZSAVAŞÇI
  3. Danışmanlar: DOÇ. DR. FEVZİ GÜMRAH
  4. Tez Türü: Yüksek Lisans
  5. Konular: Petrol ve Doğal Gaz Mühendisliği, Petroleum and Natural Gas Engineering
  6. Anahtar Kelimeler: Yeraltı gaz depolaması, tasarım, tuz boşluğu, karlılık, risk. VI, Ankara, Gaz depolama, Stratejik planlama, Underground Gas Storage, design, salt cavern, profitability, risk IV, Ankara, Gas storage, Strategic planning
  7. Yıl: 1998
  8. Dil: İngilizce
  9. Üniversite: Orta Doğu Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Petrol ve Doğal Gaz Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

öz ANKARA İÇİN DOGALGAZ YERALTI DEPOLAMASININ STRATEJİK PLANLAMASI VE FİZİBİLİTE ÇALIŞMASI Özsavaşçı Emrah Yüksek Lisans, Petrol ve Doğal Gaz Mühendisliği Bölümü Tez Yöneticisi : Doç. Dr. Fevzi Gümrah Eylül 1998, 385 Sayfa Doğal gaz enerji sektöründe enerji kaynaklan arasında sürekli artan kullanım payı ve gelişen ticaret hacmi ile önemini 1990 yılından bu yana devam ettirmektedir. Bu çalışmada Ankara'nın ihtiyacına yamt vermek üzere tuz boşluklarında yeraltı gaz depolaması projesi geliştirilmiştir. Çalışmada model olarak Ankara'nın seçilmesinin nedeni başkent olması nedeni ile stratejik önemidir. Bu projenin amacı kış dönemlerinde karşılaşılan aşın gaz ihtiyacını karşılayabilmek ve mümkün olabilecek doğalgaz temini güçlüklerine karşı hazırlıklı olmaktır. Bu amaçla 1991 ve 1997 yıllan arası hava ve tüketim değerleri kullanılarak Ankara'nın 2010 yılına kadar doğalgaz ihtiyacı belirlenmiştir. Sözkonusu ihtiyacı karşılayacak tuz boşluğu miktan hesaplanmış ve mümkün olan senaryolar çerçevesinde karlılık analizi yapılmıştır. Projenin hayata geçirilmesinde karşılaşılabilecek riskler incelenmiştir.Enerji projeleri uzun tasarım ve yatırım aşamaları gerektiren yatırım maliyeti yüksek projelerdir. Tasarımda yada projenin gerçekleştirilmesinde meydana gelebilecek gecikmeler, yada planlama hataları optimal olmayan ve yüksek maliyetli çözümlere neden olurlar. Bu sebeple, sektörde yatırımlar gerçek ihtiyaç başgöstermeden planlanmalı ve arttırılmalıdır. Sözkonusu projelerde yatırımlar gerekli izinler verildiği ve yasal düzenlemeler yapıldığı takdirde, özel sektör girişimleri ile arttırılabilir. Enerji projelerinde özel sektör daha aktif rol üstlenmeli ve yatırımlarını arttırmalıdır.

Özet (Çeviri)

ABSTRACT STRATEGICAL PLANNING AND FEASIBILITY STUDY ON UNDERGROUND GAS STORAGE FOR ANKARA Özsavaşçı, Emrah M.Sc, Department of Petroleum and Natural Gas Engineering Supervisor : Assoc. Prof. Dr. Fevzi Gümrah September 1998, 385 pages Natural gas has been a major feature of Turkish energy sector since 1990. In this study, the project for underground storage of natural gas in salt caverns was studied for Ankara that has the strategical importance by being the capital city of Turkey. The aim of this project is to meet the winter peak demands and to ensure the deliverability of the natural gas against possible supply interruptions. Using the temperature and consumption data relationship between the years 1991 and 1997, the gas demand scenarios for Ankara up to year 2010 were forecasted. The required number of caverns was estimated according to this forecast. The commercial profitability analysis of this project based on today's possible scenarios led us to different cash flow alternatives. Risk assessment of the project gave us the awareness of potential risks that can be faced during the realization of the project. mEnergy projects need very long preparation and investment periods and are very costly. Delays in planning and implementation of the projects lead to non-optimal and costly emergency solutions. For this reason, number of investments in the sector should be increased before the actual demand arises. It would be possible to increase the investments in the sector with an increased private sector share, for which, legal infrastructure and permission systems are required. It is recommended that, along with the public sector, the private sector should also play a more active role and increase its investments in the sector.

Benzer Tezler

  1. Türkiye'de yeraltı gaz depolaması gereksinimi ve Kuzey Marmara gaz sahasının depo olarak modellenmesi

    The need for underground gas storage in turkey and modeling of the Northern Marmara gas field as a storage reservobr

    HÜLYA KARAALİOĞLU

    Yüksek Lisans

    Türkçe

    Türkçe

    1997

    Petrol ve Doğal Gaz Mühendisliğiİstanbul Teknik Üniversitesi

    Petrol ve Doğal Gaz Mühendisliği Ana Bilim Dalı

    PROF. DR. ABDURRAHMAN SATMAN

  2. Maliyet + kar usulü ile yapılan bir üniversite inşaatının proje yönetim sistemi el kitabı

    Başlık çevirisi yok

    MURAT ŞAMİL ÇAPAR

    Yüksek Lisans

    Türkçe

    Türkçe

    1998

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    Yapı İşletmesi Ana Bilim Dalı

    PROF. DR. V. DOĞAN SORGUÇ

  3. Sistem yaklaşımıyla üretim planlama ve kontrol ve bir uygulama

    Production planning and control with the system approach

    NECLA KUŞSAN

    Yüksek Lisans

    Türkçe

    Türkçe

    1991

    Endüstri ve Endüstri Mühendisliğiİstanbul Teknik Üniversitesi

    PROF.DR. AHMET F. ÖZOK

  4. Foresight on defense technologies in Turkey

    Türkiye savunma teknolojileri uzgörüsü

    MEHMET KABAK

    Yüksek Lisans

    İngilizce

    İngilizce

    2001

    Bilgisayar Mühendisliği Bilimleri-Bilgisayar ve KontrolYeditepe Üniversitesi

    Bilgisayar Mühendisliği Ana Bilim Dalı

    YRD. DOÇ. DR. M. ATİLLA ÖNER

  5. Yönetim bilişim sistemleri

    Management informatıon systems

    HASAN YILMAZ

    Yüksek Lisans

    Türkçe

    Türkçe

    1993

    İşletmeİstanbul Teknik Üniversitesi

    Y.DOÇ.DR. CEMİL ALBAYRAK