The technical and financial appraisal of the Kirazli gold project of alamosgold in Turkey
Başlık çevirisi mevcut değil.
- Tez No: 720429
- Danışmanlar: Belirtilmemiş.
- Tez Türü: Yüksek Lisans
- Konular: Metalurji Mühendisliği, Maliye, Ekonomi, Metallurgical Engineering, Finance, Economics
- Anahtar Kelimeler: Belirtilmemiş.
- Yıl: 2020
- Dil: İngilizce
- Üniversite: Imperıal College London
- Enstitü: Yurtdışı Enstitü
- Ana Bilim Dalı: Belirtilmemiş.
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: Belirtilmemiş.
Özet
Özet yok.
Özet (Çeviri)
The Kirazlı project is an epithermal, highly sulphidised and disseminated gold deposit located in the northern sector of the Aegean Horst and Graben System. The heterolithic phreatomagma / phreatic brecy is dominated by the gold mineralisation, which passes through andesist tuffs of the Oligo-Miocene period. Mineralization can usually be subdivided into two main types: firstly, the low-grade regional gold zone that is primarily based on Kirazlı and that includes vast areas of high grade gold. This low level mineralisation takes place both above the supergenic oxidation region and redox boundary. Furthermore, four elongated bodies of gold mineralisation, which occur in the highest argillic / advanced argillic region and slightly overlap the base of the silica cap. The Kirazlı project is a low-cost, 100% funded development project with a high return on investment. For A˘gı Da˘gı and Kirazlı projects successful feasibility studies completed in 2017, the two projects envisaged as open-pit, heap-leach operations separately. Alamos Gold expects first to develop Kirazlı then use its cash flows to fund A˘gı Da˘gı project's growth. Kirazlı is expected to generate, on average, 104,000 oz of gold over a five-year mine life, as outlined in the feasibility study. The key objectives of this study are to analyze the Kirazlı project from technological and financial perspectives, with an emphasis on currencies, recovery rates, and change in production rate. A discounted cash flow (DCF) analysis and Monte Carlo Simulations for the base and extended case to produce a net present value (NPV) and internal rate of return (IRR) distributions, and Real Option Valuation (ROV) were carried out. The DCF for Kirazlı project produced an NPV of US$ 364 million at the base case, and an NPV of US$ 249 million at the extended case with an IRR of 91% and 87%, respectively by using current gold prices and country's cost index.
Benzer Tezler
- Yapay zekâ teknolojileri ve üniversite kütüphanecilerinin yapay zekâ okuryazarlık değerlendirmesi: Araştırma üniversiteleri örneği
Artificial intelligence technologies and the assessment of artificial intelligence literacy of university librarians: The Case of research universities
MEHMET ERKEN
Yüksek Lisans
Türkçe
2025
Bilgi ve Belge Yönetimiİzmir Katip Çelebi ÜniversitesiBilgi ve Belge Yönetimi Ana Bilim Dalı
DOÇ. DR. GÜLTEN ALIR DERBENT
- The Effect of life-cycle analysis on the design of mass housing projects
Yaşam döngüsü analizlerinin toplu konut tasarımına etkileri
F. İPEK WAHEED (DAMGACIOĞLU)
- An Overview of the project evaluation concept: the process of the Devolopment Bank of Turkey
Başlık çevirisi yok
TANER SAN
- An analysis on grey water source separation as an alternative for conventional wastewater management using the case of Kocaeli Yenikent neighborhood
Konvansiyonel atık su yönetimine alternatif olarak gri su akım ayrımının Kocaeli Yenikent mahallesi örneği kullanılarak analizi
HİLAL EFE
Yüksek Lisans
İngilizce
2017
Çevre Mühendisliğiİstanbul Teknik ÜniversitesiÇevre Mühendisliği Ana Bilim Dalı
PROF. DR. AYŞE BİLSEN BAYKAL
- Paf modeli ile bir devlet hastanesinde kalite maliyetlerinin incelenmesi
Assessment of quality qosts in a state hospital within the context of the paf model
BUKET OĞUZ ALRAMAZANOĞLU
Yüksek Lisans
Türkçe
2019
Sağlık Kurumları YönetimiHacettepe ÜniversitesiSağlık Yönetimi Ana Bilim Dalı
PROF. DR. SIDIKA KAYA