Genetic-algorithm-based optimization approach for time-cost trade-off problem with generalized precedence relationships

Genel öncüllük ilişkili zaman-maliyet ödünleşim problemi için genetik algoritma tabanlı optimizasyon yöntemi

  1. Tez No: 672248
  2. Yazar: ARY HAMA FARAJ AHMED AHMED
  3. Danışmanlar: DR. ÖĞR. ÜYESİ SAMAN AMINBAKHSH
  4. Tez Türü: Yüksek Lisans
  5. Konular: İnşaat Mühendisliği, Civil Engineering
  6. Anahtar Kelimeler: Optimizasyon, Optimizasyon problemi, Optimization, Optimization problem
  7. Yıl: 2020
  8. Dil: İngilizce
  9. Üniversite: Atılım Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: İnşaat Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Bir projenin süresinin kısaltılarak toplam maliyetin düşürülmesi, bir inşaat projesinin ana hedeflerinden biri olarak düşünülebilir. Daha verimli inşaat tekniklerinin kullanılarak ve inşaat projesini hızlandırarak süre kısaltılabilir. Ek ve / veya daha verimli kaynakların tahsis edilmesiyle süre kısaltılması sağlanabilir. Bununla birlikte proje takviminin hızı, yüksek fiyatlı inşaat tekniklerinin uygulanması nedeniyle, ekstra maliyete neden olacaktır. Ayrıca, zamanın kısaltılması belli bir süreye kadar makul olabilir. Toplam maliyet ve projelerin süresi arasındaki bu denge, işin doğası gereği son derece zorlayıcıyı olup, henüz bununla başa çıkabilecek özelliklere sahip bir planlama yazılım paketi bulunmamaktadır. Bu işlevsellik eksikliği, zaman ve maliyetin çatışan hedefleri arasında bir denge sağlamak için çeşitli araştırmacıları sayısız optimizasyon algoritmasının geliştirilmesine teşvik etmiştir. Büyük bir çabaya rağmen, literatürün büyük çoğunluğu, pratikte sıklıkla dahil edilen çeşitli ilişkilerini göz ardı eder. Bu tezde, inşaat bağlamında zaman-maliyet ödünleşim problemi (TCTP) olarak adlandırılan bu optimizasyon probleminin çözümü için Simüle Tavlama Bazlı Genetik Algoritma önerilmiştir. Önerilen hibrit GA, bulunan çözümlerin kalitesinden ödün vermeden hızlı çözüm sağlayacak şekilde tasarlanmıştır. Önerilen optimizasyon yöntemi TCTP'leri gerçekçi örtüşen aktiviteler ve genel bağımlılık ilişkileriyle çözme yeteneğine sahiptir. Burada önerilen hibrid GA'nın performansı, çokça ve sık kullanılan problemler üzerinde test edilir ve sonuçlar, mevcut çeşitli yöntemlerle karşılaştırılır. Bu algoritmanın pratikliği, modeli büyük ölçekli gerçek durum inşaat projesine oturtarak da doğrulanır. Doğrulamanın bir sonucu olarak, önerilen algoritmanın faydası şudur: hem müşterinin hem de müteahhitin bütçeyi aşmadan projeyi hızlandırmada bu algoritmanın nasıl yardımcı olabileceğini vurgulamaktadır.

Özet (Çeviri)

Decreasing the overall cost of a project through reductions in its duration can be considered as one of the main goals of any construction project. Shortening the duration can be achieved by accelerating the construction project by utilization of more efficient construction techniques; that is, by allocation of additional and/or more productive resources. However, the expedition of the project schedule will obviously incur extra costs due to the implementation of high-price construction techniques. Meanwhile, this reduction of time might be plausible only up to a certain limit. Stemming from the highly challenging nature of this trade-off between the overall cost and the duration of the projects, still, no planning software package provides any features for tackling it. The lack of such functionality has encouraged the development of numerous optimization algorithms by several researchers for achieving a compromise between the conflicting objectives of time and cost. Despite a great deal of effort, a large body of literature ignores the various types of precedence relationships which are frequently incorporated in practice. In this thesis, a Simulated Annealing-based Genetic Algorithm is proposed for the solution of this optimization problem which is referred to as the time-cost trade-off problem (TCTP) in the construction context. The proposed hybrid GA is designed to ensure fast convergence without sacrificing the quality of the solutions found. The proposed optimization method is capable of solving TCTPs with generalized precedence relationships with realistic overlapping of activities.

Benzer Tezler

  1. İnsansız hava araçları için batarya-yakıt hücresi hibrit enerji yönetim sisteminin geliştirilmesi

    Development of a battery-fuel cell hybrid energy management system for unmanned aerial vehicles

    BARAN KUL

    Yüksek Lisans

    Türkçe

    Türkçe

    2026

    Elektrik ve Elektronik Mühendisliğiİstanbul Teknik Üniversitesi

    Elektrik Mühendisliği Ana Bilim Dalı

    DOÇ. DR. MEHMET ONUR GÜLBAHÇE

  2. Sis Bilişimde Sağlık Verilerinin Görev Planlaması içinOptimizasyon Yaklaşımlarının İncelenmesi

    Exploration of Optimization Approaches for Task Scheduling in Fog Computing for Healthcare Data

    FATMA BANU İSPİR

    Yüksek Lisans

    Türkçe

    Türkçe

    2026

    Bilgisayar Mühendisliği Bilimleri-Bilgisayar ve KontrolFırat Üniversitesi

    Yazılım Mühendisliği Ana Bilim Dalı

    PROF. DR. ERKAN TANYILDIZI

  3. Sivas yöresinde akraba evliliği yapan ve yapmayan çiftlerde dermatoglifik benzerlikler

    Similarities of dermataoglyphies among individval of married relatives and married couples not related to each other in Sivas region

    Y. SELMA SÜNGÜ

    Yüksek Lisans

    Türkçe

    Türkçe

    1984

    Tıbbi BiyolojiCumhuriyet Üniversitesi

    Tıbbi Biyoloji ve Genetik Ana Bilim Dalı

    YRD. DOÇ. DR. İLHAN SEZGİN

  4. Ferrokrom fabrikasında çalışan işçilerde stogenetik çalışmalar

    Başlık çevirisi yok

    AYNUR ACAR

    Doktora

    Türkçe

    Türkçe

    1985

    Tıbbi BiyolojiAkdeniz Üniversitesi

    Tıbbi Biyoloji ve Genetik Ana Bilim Dalı

    DOÇ. DR. GÜVEN LÜLECİ

  5. Gen mühendisliği

    Başlık çevirisi yok

    MERAL HAZIROL

    Yüksek Lisans

    Türkçe

    Türkçe

    1987

    Tıbbi BiyolojiEge Üniversitesi

    Tarla Bitkileri Ana Bilim Dalı