Development of a model for open pit limits optimization integrated with a sequencing system
Üretim planlama sistemi ile bütünleştirilmiş açık ocak sınır optimizasyonu için bir model geliştirilmesi
- Tez No: 56549
- Danışmanlar: DOÇ. DR. NEŞE ÇELEBİ
- Tez Türü: Doktora
- Konular: Maden Mühendisliği ve Madencilik, Mining Engineering and Mining
- Anahtar Kelimeler: Net Bugünkü Değer Optimizasyonu, Açık Ocak Sınır Optimizasyonu, Üretim Planlaması Optimizasyonu, Üretim Simülasyonu vı, Açık ocak madenciliği, Optimizasyon, Üretim planlaması, NPV Maximization, Open Pit Limit Optimization, Extraction Sequencing, Production Simulation IV, Open pit mining, Optimization, Production planning
- Yıl: 1996
- Dil: İngilizce
- Üniversite: Orta Doğu Teknik Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: Maden Mühendisliği Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: Belirtilmemiş.
Özet
Açık ocak tasannu, jeolojik, teknik ve ekonomik sınırlamalar altında, bir cevher yatağından elde edilebilecek kârın maksimizasyonunu hedefleyen karmaşık bir iştir. Optimum ocak sınırlarının tesbiti ve bu sınırlar için yapılan optimum üretim planlaması, açık ocak tasarımının temel konularındandır. Yapılan çalışmalar genelde, birbirlerinin devamı olan bu konulan bağımsız olarak düşünmüş ve bir arada ele almamışlardır. Halbuki, üretim planlamasının gözardı edildiği bir sınır optimizasyonu, paranın zaman değerinin hesaba katılmaması demektir. Bu kabule göre bulunan bir ocak sının ise ekonomik açıdan gerçek optimum olarak kabul edilemez. Bir sonraki basamak olan üretim planlaması algoritmaları ise bu sınırlan optimum varsayıp, cevher çıkaranını bu sınırlar içinde yapacak şekilde geliştirilmiştir. Bu çalışmada, mevcut yaklaşımlardan farklı olarak, net indirgenmiş kârı maksimize ederek optimum ocak sınırlarını, üretim planlamasının fonksiyonu olarak bulan bir model geliştirilmiştir. Bumodel dinamik programlama yoluyla, madendeki üretimi, stoklardaki malzeme hareketlerini, harmanlama ve cevher hazırlama tesislerinin beslenmesini simüle ederek ve nihai şev açışım da dikkate alarak, net bugünkü değeri hesaplamaktadır. Ayrıca ocağın her yeni durumunda birim maliyet hesaplanması için, bir birim maliyet hesap sistemi modelle etkileşimli kullanılarak, optimizasyonda başka ocaklardan aktarılan birim maliyetlerin kullanılmasının getirdiği hata payı en aza indirilmiştir. Mevcut yaklaşımlardan farklı olarak ocak sınırlarının ve üretim planlamasının beraber optimize edildiği sistem, ocak başlangıç noktası, sınır tenoru, yıllık üretim miktarı, stok ve cevher tesislerinin şartlan gibi parameterleri değiştirme imkanı da sunmaktadır. Geliştirilen algoritmalar C++ dilinde programlanmış ve bir madencilik probleminde uygulanmıştır, örnek çalışma sonuçlan, geliştirilen modelin geçerliliğini göstermiştir.
Özet (Çeviri)
Open pit design is a complicated task aiming maximization of the profit that can be gained from an ore body under geological, technical and economical constraints. Determination of optimum pit limits and optimum production planning performed for these limits are the basic subjects of open pit design. In general, the previous researches have considered these successive subjects as independent and not handled them as integrated. However, pit limits optimization ignoring production sequencing means exclusion of time value of money. A pit limit determined by this assumption can not be accepted as real optimum from the economical point of view. The succeeding step; sequencing algorithms have been developed to extract the ore body in these limits, assuming them to be optimum. In this study, a model different than the existing approaches, maximizing the net discounted profit has been developed to determine the optimum pit limits as a function of production sequencing. This model calculates the net present value by dynamic programming, simulating mine 111production, material flow in stockpiles, blending and plant feeding and regarding the ultimate pit slope angle. Besides, a unit cost estimation system has been interacted with the model to calculate the unit costs for each new conditions of the pit and the bias caused by transferring the unit cost of other mines has been minimized. The system in which pit limits and extraction sequencing have been optimized simultaneously, also provides the ability of changing the parameters like mine starting point, cutoff grade, annual production rate, stockpile and processing plant conditions. The developed algorithms have been programmed in C++ language and applied in a mining problem. The logical results of sample study has revealed the validity of the developed model.
Benzer Tezler
- Çimento hammaddelerinin özellikleri, optimizasyonu ve SURPAC 2000 ile bir saha çalışması
Başlık çevirisi yok
İSMET GÜÇLÜ KATIRCIOĞLU
Yüksek Lisans
Türkçe
1998
Maden Mühendisliği ve Madencilikİstanbul Teknik ÜniversitesiMaden Mühendisliği Ana Bilim Dalı
YRD. DOÇ. DR. HASAN ERGİN
- Açık ocaklarda toz dağılımının bir bilgisayar yazılımı ile değerlendirilmesi
Evaluation of dust dispersion in open pits by a computer program
ERSAN DEĞERLİ
Yüksek Lisans
Türkçe
2001
Maden Mühendisliği ve MadencilikHacettepe ÜniversitesiMaden Mühendisliği Ana Bilim Dalı
DOÇ. DR. BAHTİYAR ÜNVER
- Açık işletmelerde uygun delme-patlatma şartlarını veren bir modelin geliştirilmesi
The development of a model to obtain suitable drilling and blasting conditions in open pit mines and quarries
SAİR KAHRAMAN
Doktora
Türkçe
1997
Maden Mühendisliği ve Madencilikİstanbul Teknik ÜniversitesiMaden Mühendisliği Ana Bilim Dalı
PROF. DR. NUH BİLGİN
- Türkiye'deki çimento endüstrisinin yarattığı hava kirliliği ve modellenmesi
Başlık çevirisi yok
VOLKAN ARINCI
Doktora
Türkçe
1998
Kimya Mühendisliğiİstanbul Teknik ÜniversitesiMetalurji Mühendisliği Ana Bilim Dalı
PROF. DR. A. NURSEN İPEKOĞLU
- Soma linyit havzasının rezerv ve kalite yönünden değerlendirilmesi, uzun vadeli üretim, tüketim ve yatırım planlaması (2 cilt)
Başlık çevirisi yok
SEBAHATTİN GAZANFER