Geri Dön

Optimum determination of number, capacity and location of bioenergy power plant/s by using geographic information system: A case study in Bismil

Coğrafi bilgi sistemi kullanarak biyoenerji güç tesisi veya tesislerinin sayı, kapasite ve yerlerinin optimum bir şekilde belirlenmesi: Bismil'de bir uygulama çalışması

  1. Tez No: 537364
  2. Yazar: ADEM AKGÜL
  3. Danışmanlar: PROF. DR. SERAP ULUSAM SEÇKİNER
  4. Tez Türü: Yüksek Lisans
  5. Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2018
  8. Dil: İngilizce
  9. Üniversite: Gaziantep Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Diyarbakır'ın Bismil ilçesi tarımsal aktivitelerin oldukça yoğun olduğu bir bölgedir. Bölgenin yaklaşık %60'ı sulanabilmektedir. Bu sulu alanlarda daha çok pamuk ve mısır yetiştirilmektedir. Bu çalışmada pamuk ve mısır atıklarından enerji üretecek CCHP (trijenerasyon = birleşik soğuk, sıcak ısı ve güç) tesis ya da tesislerinin sayılarını, yerlerini ve kapasitelerini optimize eden karışık tam sayılı doğrusal bir model ve bir metasezgisel algoritma geliştirilmiş ve çözülmüştür. Her iki teknik de hammadde taşıma maliyetleri, son ürün taşıma maliyetleri ve tesis ve boru hattı kuruluş maliyetleri arasındaki ödünleşimleri karşılaştırarak muhtemel bir yatırımın net bugünkü değerini maksimize etmeye çalışmaktadır. Modeldeki tüm noktalar (arz, tesis, ısı talep, elektrik dağıtım) Coğrafi Bilgi Sistemi üzerinde belirlenmiştir. Bununla birlikte önerilen karışık tam sayılı programlama modelinin çalışırlığını test etmek için problemin boyutu küçültülmüştür. Modelin çalışırlığı kanıtlandıktan sonra Bismil'deki gerçek bir problem için benzetilmiş tavlama metasezgiseli kullanılmıştır. Çalışmada üretilen elektrik, sıcak ve soğuk ısı ve gübre (biochar) yıllık birer getiri olarak; hammadde satın alma, hammadde taşıma, ısı taşıma, enerji taşıma sırasındaki kayıplar ve tesis ve ısı hatlarının operasyonel bakım maliyetleri yıllık gider olarak ele alınmıştır. İlk yatırım maliyetleri tesis kuruluş maliyetleri, ısı hatları ve elektrik hatları kurulum maliyetlerinden oluşmaktadır. Model yaklaşık 29 Mwlık 1 tesis önermiştir. 41 yerleşim yerinin sadece soğuk ısı, 9 yerleşim yerinin ise hem soğuk hem de sıcak ısı talepleri karşılanmıştır. Yatırımın net bugünkü değeri yaklaşık 260 Milyon Avro olup geri ödeme süresi 1,3 yıldır.

Özet (Çeviri)

Bismil district of Diyarbakir is a region where agricultural activities are very common. About 60% of the terrain is irrigable. Cotton and corn are mostly grown in these irrigable lands. In this study, a mixed integer linear programming (MILP) model and a metaheuristic algorithm which optimize the numbers, locations and capacities of the CCHP (tri-generation=combined cooling, heating and power) facility(ies) that produces energy from cotton and corn residues were developed and solved. Both technics try to maximize the net present value of the potential investment by comparing the trade-offs between the agricultural residues/endproduct transportation costs, facility(ies) and pipeline installation costs. All points (supply, candidate power plant, heat demand, electricity distribution) were determined in Geographic Information System. However, size of the problem was reduced to test the viability of the proposed MILP model. After proving viability of the MILP model, a metaheuristic algorithm (Simulated Annealing) was employed for a real-world problem in Bismil. As annual revenue, electricity, the heating/cooling energy and the fertilizer (biochar) sale; as for annual expenses, transportation of raw materials and heating/cooling energy, losses during heat and electricity transportation, operational maintenance costs of facilities and pipelines were considered. Initial investment cost includes facility, pipeline and electricity transmission installation costs. The model proposed 1 facility with an installed power of about 29 MW. Cooling energy demand of 41 settlements, both cooling and heat energy demand of 9 settlements were met. The net present value of the investment is almost 260 million euro and the repayment period is 1,3 years.

Benzer Tezler

  1. Demiryolu yük taşımacılığında optimum katar yükü probleminin incelenmesi

    Determination of the optimum train load in railway freight transportation

    SADETTİN ÖZEN

    Doktora

    Türkçe

    Türkçe

    1984

    Ulaşımİstanbul Teknik Üniversitesi

    PROF. DR. GÜNGÖR EVREN

  2. Sağlık hizmetlerine erişim ve hastane yer seçimi: İstanbul örneği

    Access to healthcare and hospital location: The case of Istanbul

    MUHAMMED ZİYA PAKÖZ

    Doktora

    Türkçe

    Türkçe

    2014

    Şehircilik ve Bölge Planlamaİstanbul Teknik Üniversitesi

    Şehir ve Bölge Planlama Ana Bilim Dalı

    YRD. DOÇ. DR. MEHMET ALİ YÜZER

  3. Deprem kuvvetlerine karşı betonarme perdelerin davranışı ve boyutlandırılması

    The Behaviour and design of reinforced concrete structural walls for earthquake resistance

    YILDIR AKKAYA

    Yüksek Lisans

    Türkçe

    Türkçe

    1997

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    PROF. DR. ZEKAİ CELEP

  4. Deniz taşımacılığının çok modlu taşımacılıktaki optimal yerinin Türkiye koşulları için araştırılması

    Investigation of the optimal position of maritime transportation in multimodal transportation for Turkey

    EDA TURAN

    Doktora

    İngilizce

    İngilizce

    2014

    UlaşımYıldız Teknik Üniversitesi

    Gemi İnşaatı ve Gemi Makineleri Mühendisliği Ana Bilim Dalı

    PROF. DR. BAHRİ ŞAHİN

  5. İstanbul'daki konaklama yapılarının yatak odası kitlelerinin yönlenme kararlarının analizi

    Analysis of orientation of bedroom masses in accommodation buildings in Istanbul

    ELİF BÜYÜKEKİZ ŞİMŞEK

    Yüksek Lisans

    Türkçe

    Türkçe

    2017

    MimarlıkYıldız Teknik Üniversitesi

    Mimarlık Ana Bilim Dalı

    DOÇ. DR. SERVER FUNDA KERESTECİOĞLU