Gemilerin liman ve deniz tecrübelerinin planlanması
The Planning of dock and sea trials
- Tez No: 46434
- Danışmanlar: PROF.DR. REŞAT BAYKAL
- Tez Türü: Yüksek Lisans
- Konular: Su Ürünleri, Gemi Mühendisliği, Aquatic Products, Marine Engineering
- Anahtar Kelimeler: Deniz tecrübesi, Gemiler, Liman tecrübesi, Sea trial, Ships, Port trial
- Yıl: 1995
- Dil: Türkçe
- Üniversite: İstanbul Teknik Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: Belirtilmemiş.
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: Belirtilmemiş.
Özet
4.9. Lighting Installation 4.10. Navigations Lanterns 4.11. Indicators and Alarms 5. Navigations and Radio Communication Installations Tests, 5.1. Radio Communications 5.2. Telephones 5.3. Electronavaids And Radionavaids 6. Automatics, Control and Monitoring Systems Tests. The subject of sea trials is also a very important element in a newbuilding contract and the shipyard and the owner agrees where and how these trials are conducted. The two may disagree over this point and delivery may be refused. Sea trials are designed to examine the ship as a complete unit. On board areas for scrutiny are broken down into hull, navigational and nautical equipment and machinery and electrical installations. The conditions for starting the sea trials are; a). The dock testing of all machinery, equipment and systems should be completed, b). The ship is allowed to start the voyage when her manoeuvring/signalling equipment in the engine room and on the ship are full working order, c). For the whole time of the sea trials, the following systems should be on; - Fire-fighting central unit, - Air-conditioning system, - Potable and sanitary water system, - sewage treatment plant. d). The proper computer system insulation, electric arrangement insulations should be obtained and presented to the owner, e). Stand-by machinery should be operated in the same way as the main one. The sea trials examined in this work are as follows; 1. Speed Test 2. Determination Of Ship's Inertia Test 3. Manoeuvre Speed Steps
Özet (Çeviri)
4. Determination Of Ship's Radius Of Turning 5. Course Keeping Ability 6. Manoevrability with Ship's Minimum Speed 7. Z Manoeuvre 8. Williamson's Loop 9. Vibration/Noise 10. Steering Gear 11. Anchor Arrangement 12. Mooring Arrangement 13. Life-Saving Appliances 14. Main Engine 15. Waste Heat Boiler 16. Evaporators 17. Electrical Installations 18. Control, Remote Control, Autocontrol System 19. Navigation and Communications Equipment The dock trials are the testing and verifying the arrangement of auxiliary machinery, equipment and systems. The sea trials are the determination of the running condition and the state of the systems together with the whole ship performance. For example, the performance test are applied to main engine in various running conditions at the sea trials. However, the tests of the main engine outfitting, piping system and other equipment are performed in the dock trials. The dock and sea trials ought to completed in the short time between launching and the first voyage. After that, time is the most important component. The dock and sea trials should be programmed and organised according to a schedule plan. XI4.9. Lighting Installation 4.10. Navigations Lanterns 4.11. Indicators and Alarms 5. Navigations and Radio Communication Installations Tests, 5.1. Radio Communications 5.2. Telephones 5.3. Electronavaids And Radionavaids 6. Automatics, Control and Monitoring Systems Tests. The subject of sea trials is also a very important element in a newbuilding contract and the shipyard and the owner agrees where and how these trials are conducted. The two may disagree over this point and delivery may be refused. Sea trials are designed to examine the ship as a complete unit. On board areas for scrutiny are broken down into hull, navigational and nautical equipment and machinery and electrical installations. The conditions for starting the sea trials are; a). The dock testing of all machinery, equipment and systems should be completed, b). The ship is allowed to start the voyage when her manoeuvring/signalling equipment in the engine room and on the ship are full working order, c). For the whole time of the sea trials, the following systems should be on; - Fire-fighting central unit, - Air-conditioning system, - Potable and sanitary water system, - sewage treatment plant. d). The proper computer system insulation, electric arrangement insulations should be obtained and presented to the owner, e). Stand-by machinery should be operated in the same way as the main one. The sea trials examined in this work are as follows; 1. Speed Test 2. Determination Of Ship's Inertia Test 3. Manoeuvre Speed Steps4. Determination Of Ship's Radius Of Turning 5. Course Keeping Ability 6. Manoevrability with Ship's Minimum Speed 7. Z Manoeuvre 8. Williamson's Loop 9. Vibration/Noise 10. Steering Gear 11. Anchor Arrangement 12. Mooring Arrangement 13. Life-Saving Appliances 14. Main Engine 15. Waste Heat Boiler 16. Evaporators 17. Electrical Installations 18. Control, Remote Control, Autocontrol System 19. Navigation and Communications Equipment The dock trials are the testing and verifying the arrangement of auxiliary machinery, equipment and systems. The sea trials are the determination of the running condition and the state of the systems together with the whole ship performance. For example, the performance test are applied to main engine in various running conditions at the sea trials. However, the tests of the main engine outfitting, piping system and other equipment are performed in the dock trials. The dock and sea trials ought to completed in the short time between launching and the first voyage. After that, time is the most important component. The dock and sea trials should be programmed and organised according to a schedule plan. XI4.9. Lighting Installation 4.10. Navigations Lanterns 4.11. Indicators and Alarms 5. Navigations and Radio Communication Installations Tests, 5.1. Radio Communications 5.2. Telephones 5.3. Electronavaids And Radionavaids 6. Automatics, Control and Monitoring Systems Tests. The subject of sea trials is also a very important element in a newbuilding contract and the shipyard and the owner agrees where and how these trials are conducted. The two may disagree over this point and delivery may be refused. Sea trials are designed to examine the ship as a complete unit. On board areas for scrutiny are broken down into hull, navigational and nautical equipment and machinery and electrical installations. The conditions for starting the sea trials are; a). The dock testing of all machinery, equipment and systems should be completed, b). The ship is allowed to start the voyage when her manoeuvring/signalling equipment in the engine room and on the ship are full working order, c). For the whole time of the sea trials, the following systems should be on; - Fire-fighting central unit, - Air-conditioning system, - Potable and sanitary water system, - sewage treatment plant. d). The proper computer system insulation, electric arrangement insulations should be obtained and presented to the owner, e). Stand-by machinery should be operated in the same way as the main one. The sea trials examined in this work are as follows; 1. Speed Test 2. Determination Of Ship's Inertia Test 3. Manoeuvre Speed Steps4. Determination Of Ship's Radius Of Turning 5. Course Keeping Ability 6. Manoevrability with Ship's Minimum Speed 7. Z Manoeuvre 8. Williamson's Loop 9. Vibration/Noise 10. Steering Gear 11. Anchor Arrangement 12. Mooring Arrangement 13. Life-Saving Appliances 14. Main Engine 15. Waste Heat Boiler 16. Evaporators 17. Electrical Installations 18. Control, Remote Control, Autocontrol System 19. Navigation and Communications Equipment The dock trials are the testing and verifying the arrangement of auxiliary machinery, equipment and systems. The sea trials are the determination of the running condition and the state of the systems together with the whole ship performance. For example, the performance test are applied to main engine in various running conditions at the sea trials. However, the tests of the main engine outfitting, piping system and other equipment are performed in the dock trials. The dock and sea trials ought to completed in the short time between launching and the first voyage. After that, time is the most important component. The dock and sea trials should be programmed and organised according to a schedule plan. XI
Benzer Tezler
- Gemi liman çarpışmasının analizi ve liman usturmaça sisteminin dizaynı
Başlık çevirisi yok
GÖKDENİZ NEŞER
Yüksek Lisans
Türkçe
1996
Su ÜrünleriDokuz Eylül ÜniversitesiDeniz Bilimleri Ana Bilim Dalı
PROF. DR. NİHAT TAŞPINAR
- Konteyner taşımacılığı ve konteyner kreynleri
Başlık çevirisi yok
YAŞAR KEMAL DÖNMEZ
Yüksek Lisans
Türkçe
1994
Ulaşımİstanbul ÜniversitesiDeniz Ulaştırma İşletme Mühendisliği Ana Bilim Dalı
PROF. DR. ŞEVKET BAKIR
- Türkiye denizcilik sektöründe çalışma şartları (monografik bir etüd)
Başlık çevirisi yok
A.MURAT ASLANER
Yüksek Lisans
Türkçe
1988
İşletmeİstanbul ÜniversitesiÇalışma Ekonomisi ve Endüstri İlişkileri Ana Bilim Dalı
PROF. DR. TURAN YAZGAN