Farklı coğrafî bölgelerde petrol kuyusu açma maliyetlerinin PERT-CPM proje planlama teknikleri ile karşılaştırmalı analizi
Comparative analysis of oil well drilling costs in different georaphical regions with PERT-CPM project planning techniques
- Tez No: 423618
- Danışmanlar: DOÇ. DR. MURAT ATAN
- Tez Türü: Yüksek Lisans
- Konular: İşletme, Endüstri ve Endüstri Mühendisliği, Ekonometri, Business Administration, Industrial and Industrial Engineering, Econometrics
- Anahtar Kelimeler: Kritik yol yöntemi, Kuyular, Maliyet, Maliyet analizi, Maliyet planlaması, PERT, Petrol arama, Proje yönetimi, Yöneylem araştırması, Zaman planlama, Critical path method, Wells, Cost, Cost analysis, Cost planning, PERT, Petroleum exploration, Project management, Operations research, Time planning
- Yıl: 2015
- Dil: Türkçe
- Üniversite: Gazi Üniversitesi
- Enstitü: Sosyal Bilimler Enstitüsü
- Ana Bilim Dalı: Ekonometri Ana Bilim Dalı
- Bilim Dalı: Uygulamalı Yöneylem Araştırması Bilim Dalı
- Sayfa Sayısı: Belirtilmemiş.
Özet
Bu çalışmanın amacı, farklı coğrafî bölgelerde, benzer derinliklerde petrol üretim kuyusu açma projelerinin, PERT-CPM proje planlama teknikleri kullanılarak, proje planlarını oluşturmak ve lokasyon farklılığının projelerin zaman ve maliyet değişkenlerini nasıl etkilediğini ortaya koymaktır. Bir diğer amaç ise, proje planlama tekniklerinin farklı bir sektörde uygulamasını literatüre kazandırmaktır. Çalışmada, WINQSB programı kullanılarak PERT-CPM tekniklerinin iki petrol üretim kuyusu projesi üzerinde uygulamasına yer verilmiştir. İlgili projelerde gerçekleştirilecek faaliyetlerin süre tahminleri yapılarak proje planları oluşturulmuş ve bu projelere ilişkin toplam maliyetlerin tahmini işlemleri gerçekleştirilmiştir. Ardından Şirketin proje mühendisleri tarafından proje hızlandırma işlemleri için bütçe kısıtları belirlenmiş ve bu bütçe kısıtları altında mümkün olan her bir zaman noktasına hızlandırma işlemleri yapılarak, hızlandırılmış proje planları içerisinden her iki kuyu için optimum proje planları elde edilmiştir. Projeler süresince faaliyetlerde hiçbir gecikme olmadığı varsayımıyla, optimum proje planlarının uygulanması sonucu ilgili projelerin beklenen sürelerinden önce, sırasıyla %13,89 ve %7,36 kâr ile tamamlanabileceği öngörülmüştür.
Özet (Çeviri)
The purpose of this study is to make the project plans of the projects of oil well drilling with similar depths in different georaphical regions by using PERT-CPM project-planning techniques and to reveal how the differences of location affects the time and costs of the projects. Another purpose is to make the implementation of the project planning techniques in a different sector be contributed to the literature. The implementation of the PERT-CPM techniques on two oil well projects is included in the study via WINQSB program. The time of the activities to be performed were estimated for the relevant projects and the project plans were prepared. Besides, the transactions of the total costs estimations were carried out. Budget constraints were determined by the project engineers of the Company, the acceleration acts to each point of time possible under these budget constraints were performed, and out of these accelerated project plans, optimum project plans were obtained for each well. Based on the assumption that no delays occurred in the activities during the projects, it was projected that as a result of the implementation of the optimum plans, the relevant projects could be completed before their expected completion times with 13,89% and 7,36% profits, respectively.
Benzer Tezler
- Uluslararası havayolu hisse senedi getirilerinin oynaklığının GARCH yaklaşımıyla VIX, Brent petrol fiyatları ve ekonomik politika belirsizliği endeksi üzerine bir inceleme
An examination of international airline stock returns discussion using GARCH approach on VIX, Brent oil prices and economic policy uncertainty index
MUHAMMAD MAHER ALBOUNI
Yüksek Lisans
Türkçe
2025
MaliyeKütahya Dumlupınar ÜniversitesiUluslararası Ticaret ve Finansman Ana Bilim Dalı
DR. ÖĞR. ÜYESİ FERİT KARAHAN
- Assessment of the envıronmental ımpact of oıl refınery operatıonsın erbıl, Iraq: a geologıcal perspectıve
Irak erbil'deki petrol rafineri faaliyetlerinin çevresel etkilerinin değerlendirilmesi: Jeolojik bir perspektif
MURAD KHAN MAHMOOD AHMED AHMED
Yüksek Lisans
İngilizce
2025
Çevre MühendisliğiHarran ÜniversitesiÇimento Mühendisliği Ana Bilim Dalı
PROF. DR. MEHMET FATİH DİLEKOĞLU
- Yangın riski taşıyan açık alanlar için CBS tabanlı, bulut altyapılı, yüksek hassasiyetli, nanofotonik erken yangın tespit sistemi tasarımı ve uygulaması
Design and implementation of a GIS based, cloud substructured, high sensitive, nanophotonic early fire detection system for fire risk areas
YÜCEL GÜLLÜCE
Doktora
Türkçe
2019
Bilim ve Teknolojiİstanbul Teknik ÜniversitesiBilişim Uygulamaları Ana Bilim Dalı
PROF. DR. RAHMİ NURHAN ÇELİK
- Combustion kinetics of asphaltites compared to coals through isoconversional analysis
Asfaltitlerin yanma kinetiğinin eşdönüşüm yöntemiyle kömürlerle karşılaştırılması
ELAHE DORREH
Yüksek Lisans
İngilizce
2024
Petrol ve Doğal Gaz Mühendisliğiİstanbul Teknik ÜniversitesiPetrol ve Doğal Gaz Mühendisliği Ana Bilim Dalı
PROF. DR. MURAT ÇINAR
- A hybrid system for real-time personnel tracking in drilling field
Sondaj sahasında gerçek zamanlı personel takibi için hibrit bir sistem
MEHMET ŞERİF ARSLAN
Yüksek Lisans
İngilizce
2021
Petrol ve Doğal Gaz Mühendisliğiİstanbul Teknik ÜniversitesiPetrol ve Doğal Gaz Mühendisliği Ana Bilim Dalı
DR. ÖĞR. ÜYESİ MUSTAFA HAKAN ÖZYURTKAN