Geri Dön

Feasibility study of proposed sidings development at midsomer norton station

Başlık çevirisi mevcut değil.

  1. Tez No: 401382
  2. Yazar: USAME EKİCİ
  3. Danışmanlar: DR. GURMEL GHATAORA
  4. Tez Türü: Yüksek Lisans
  5. Konular: İnşaat Mühendisliği, Civil Engineering
  6. Anahtar Kelimeler: Ground investigation, railway siding, embankment, soil strength, earthwork, laboratory testing on soil
  7. Yıl: 2013
  8. Dil: İngilizce
  9. Üniversite: The Unıversıty Of Bırmıngham
  10. Enstitü: Yurtdışı Enstitü
  11. Ana Bilim Dalı: İnşaat Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Özet yok.

Özet (Çeviri)

It is planned to reopen Midsomer Norton Railway Station, which is a station on the Somerset & Dorset Heritage Railway Line, to traffic. As a first step, Midsomer Norton will be terminal and it is proposed to build a siding and a depot for the terminating trains. However, a ground investigation is essential before starting building the siding and the depot, as it is the vital part of any civil engineering process. Ground's behaviour must be known in order to form a structure on it. Data from ground investigation is a reference for any kind of structures. This study covers a site investigation including a desk study, walkover survey, sampling and laboratory testing in order to perform a suitable design. Moisture content test, liquid limit and plastic limit tests, standard compaction test, shear vane test and triaxial compression tests were carried out to determine the soil characteristics and to analyse the soil behaviour. 4 trial pits were excavated to depth of 0.8 metres, layers and visual properties of the soil were identified on site. The material is identified as mudstone of Mercia Mudstone Group, which is commonly encountered in constructions in the UK. Natural moisture content of the soil was obtained from moisture content tests applied on 8 samples, ranges from 27.98% to 40.57% depending on the location of the samples. Similarly, Atterberg Limits tests were performed on 8 samples and liquid limit was found between 63.66% and 90.13%, and plastic limit is between 37.92% and 54.67%. On the basis of these values, the soil material is defined as very high plasticity clay. After classification, compaction and shear strength tests were carried out and they gave the results of average optimum moisture content is 33.55%, maximum dry density is 1.34 g/cm3; cohesion c' = 75 Kpa and shearing resistance angle ϕ = 41°. Results of the tests were evaluated and slope stability and bearing capacity analysis were processed. An alignment was drawn using Autocad and the amount of earthwork was calculated. It was found that the ground is capable to build the proposed structure, however there is a need for 370.123 m3 fill earthwork. A strong recommendation was made to follow systems engineering approach in the construction phase, as well as the design stage. Dependability of the system is ensured by the good use of V – process of systems engineering. It is also recommended to undertake further testing including sulphate content and consolidation tests to confirm the validity of the design processed in this study.

Benzer Tezler

  1. Feasibility study of implementing and integrating gas turbines in a commercial nuclear power plant

    Ticari bir nükleer güç santralinde gaz türbinlerinin uygulanabilirliği ve entegrasyonu üzerine fizibilite çalışması

    CAN ALP ALAÇAM

    Yüksek Lisans

    İngilizce

    İngilizce

    2023

    EnerjiPeter The Great St. Petersburg Polytechnıc Unıversıty

    Enerji Mühendisliği Ana Bilim Dalı

  2. Feasibility Study on Generating Downforce with a Wing Mounted Inside of a Race Car's Sidepod

    Bir yaris arabasinin icinde monte edilen bir kanat ile yere basma kuvveti uretmek icin yapilan fizibilite calismasi

    ALP EGE ZAİMAĞAOĞLU

    Yüksek Lisans

    İngilizce

    İngilizce

    2022

    Havacılık ve Uzay MühendisliğiThe Unıversıty Of Sheffıeld

    Uçak Gövde Motor Bakım Ana Bilim Dalı

    DR. ANDREW F. NOWAKOWSKİ

  3. A feasibility study and evaluation of financing models for wind energy projects: A case study on İzmir Institute of Technology campus area

    Rüzgar enerjisi projeleri için bir fizibilite çalışması ve finans modellerinin değerlendirilmesi: İzmir Yüksek Teknoloji Enstitüsü kampus alanı

    SERRA ÖZER

    Yüksek Lisans

    İngilizce

    İngilizce

    2004

    Makine Mühendisliğiİzmir Yüksek Teknoloji Enstitüsü

    Makine Mühendisliği Ana Bilim Dalı

    DOÇ.DR. BARIŞ ÖZERDEM

  4. A simulation study on economic feasibility of converting Turkish coal to liquid fuels

    Türk kömürünün sıvı yakıtlara dönüştürülen ekonomik fizibilitesi üzerine bir simülasyon çalışması

    MOHANNAD CHAAR

    Yüksek Lisans

    İngilizce

    İngilizce

    2018

    Makine MühendisliğiGaziantep Üniversitesi

    Makine Mühendisliği Ana Bilim Dalı

    PROF. DR. MEHMET SAİT SÖYLEMEZ

  5. A Study on the use of Çatalağzı thermal power plant wastes as fill material in a proposed wet disposal scheme

    Çatalağzı termik santrali atık malzemelerinin düşünülen ıslak depolama projesi kapsamında dolgu malzemesi olarak kullanılması üzerine bir çalışma

    DİDEM GÜNBULUT

    Yüksek Lisans

    İngilizce

    İngilizce

    2000

    İnşaat MühendisliğiOrta Doğu Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    PROF. DR. YENER ÖZKAN

    DOÇ. DR. ERDAL ÇOKÇA