Geri Dön

Zengin proje çizelgeleme problemi

A reach project scheduling problem

  1. Tez No: 352010
  2. Yazar: ARDA TÜRKGENCİ
  3. Danışmanlar: YRD. DOÇ. DR. MEHMET GÜLŞEN, DR. HÜSEYİN GÜDEN
  4. Tez Türü: Yüksek Lisans
  5. Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
  6. Anahtar Kelimeler: Proje bazlı üretim sistemleri, kaynak kısıtlı çizelgeleme problemleri, zaman – maliyet ödünleşmesi, öncüllük ilişkileri, çok modlu sistemler, çok projeli çizelgeleme, matematiksel programlama ve parçalı çözüm yöntemleri, Bölünebilir çizelgeleme, Faaliyet çizelgelemesi, Kaynak kısıtlı çizelgeleme, Proje çizelgeleme, Üretim çizelgelemesi, Project based manufacturing systems, resource constrained scheduling problems, time-cost tradeoff, preemptivity, multi mode systems, multiproject sheduling, mathametical programming and decomposition, Divisible scheduling, Activity tabulation, Resource constrained scheduling, Project scheduling, Production scheduling
  7. Yıl: 2014
  8. Dil: Türkçe
  9. Üniversite: Başkent Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Proje Çizelgeleme Problemleri günlük hayatta birçok proje bazlı üretim firmasının üzerinde çalıştığı öncüllük ilişkilerini ve bazı kısıtları göz önünde bulundurarak en kısa zamanda proje işlerinin tamamlanması veya minimum maliyet ile işlerin yapılması gibi hedefleri olan bir çizelgeleme problemidir. Bu çalışmada proje bazlı olarak üretim yapan bir firmada projelerin çizelgelenmesine ait bir çözüm yaklaşımı geliştirilmiştir. Problem işlerin birden fazla modda yapılabildiği, kaynak kısıtlı, çok projeli, zaman – maliyet etkileşimini göz önünde bulunduran, minimum maliyetle işlerin yapılmasını amaçlayan bir çizelgeleme problemidir. Öncelikle problemin çözümü için bir doğrusal karar modeli geliştirilmiştir. Ancak proje sayısının artması ve dolayısı ile çizelgelenecek projelerdeki iş sayısının artması, problemin boyutlarını üstel olarak arttırmaktadır. Bu nedenle büyük boyutlu problemlerin çözümü için sezgisel olarak davranan parçalı bir doğrusal karar modeli önerilmiştir. Sonuçlarda bu yöntemin çözüm süresi ve çözüm kalitesi açısından değerlendirmeleri yapılmıştır.

Özet (Çeviri)

Project scheduling is a very common problem in engineering and many companies with project based manufacturing environment have to deal with project scheduling issues on a daily basis. The goal in a project scheduling problem is to minimize the cost or the project completion time with the given precedence rules and other constraints. In this study we propose a project scheduling approach for a manufacturing company that has to manage several projects simultaneously. The scheduling problem is a multi-project, multi-mode, resource constrained problem with time-cost tradeoff decision. The objective in the problem is to minimize the aggregate cost of current and planned projects. We first developed a linear model to solve the problem. However, the total number of jobs increases with increasing number of projects, and with increasing complexity the overall problem grows exponentially. To solve the problem in a reasonable time we developed a heuristic approach which based on decomposition of the problem. Quality and time issues of the proposed model are discussed in detail.

Benzer Tezler

  1. Les applications des algorithmes genetiques dans les modüles d'Optimisation des prologiciels de Gestion integre

    İşletme kaynakları planlaması yazılımlarının optimizasyon modüllerinde genetik algoritma uygulamaları

    MELİKE ORHON

    Yüksek Lisans

    Fransızca

    Fransızca

    2001

    Endüstri ve Endüstri MühendisliğiGalatasaray Üniversitesi

    PROF. DR. ETHEM TOLGA

  2. Hydrometeorological aspects and water resources management in the northern part of Libya

    Hydrometeorological aspects and water resources management in the northern part of Libya

    ALİ GEATH MAHMOUD ELJADİD

    Doktora

    İngilizce

    İngilizce

    1997

    Meteorolojiİstanbul Teknik Üniversitesi

    Metalurji Mühendisliği Ana Bilim Dalı

    PROF. DR. ZEKAİ ŞEN

  3. Anıt eserlerin restorasyon proje ve uygulamalarında karşılaşılan sorunlar

    Problems in process the restoration projects and applications of architectural monuments

    ÖZLEM UÇARKUŞ

    Yüksek Lisans

    Türkçe

    Türkçe

    2018

    MimarlıkFatih Sultan Mehmet Vakıf Üniversitesi

    Mimarlık Ana Bilim Dalı

    DR. ÖĞR. ÜYESİ ÖMER DABANLI

  4. Türkiye'de proje yarışmaları ile elde edilen kamu yönetim yapılarının mimari özellikleri

    The architectural characteristics of the public administration constructions acquired by the project competitions in Turkey

    S. FULYA TÜRKMEN

    Yüksek Lisans

    Türkçe

    Türkçe

    2009

    MimarlıkMimar Sinan Güzel Sanatlar Üniversitesi

    Mimarlık Ana Bilim Dalı

    YRD. DOÇ. DR. RECAİ ERSİN AYNAN

  5. Fen bilgisi dersinde proje çalışmalarının öğrencilerin bilim anlayışına ve bilimsel süreçleri algılamalarına etkisi

    Başlık çevirisi yok

    AYŞEGÜL KINIK

    Yüksek Lisans

    Türkçe

    Türkçe

    2004

    Eğitim ve ÖğretimMarmara Üniversitesi

    İlköğretim Ana Bilim Dalı

    YRD. DOÇ. DR. ESRA MACAROĞLU AKGÜL