Germencik jeotermal santralinin performans analizi

Performance analysis of the Germencik geotermal power plant

  1. Tez No: 287503
  2. Yazar: MURAT ÜNVERDİ
  3. Danışmanlar: PROF. DR. YUNUS ÇERÇİ
  4. Tez Türü: Yüksek Lisans
  5. Konular: Enerji, Makine Mühendisliği, Energy, Mechanical Engineering
  6. Anahtar Kelimeler: Jeotermal alanlar, Jeotermal sular, Geothermal fields, Geothermal waters
  7. Yıl: 2011
  8. Dil: Türkçe
  9. Üniversite: Celal Bayar Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Makine Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Bu çalışmanın amacı; 47.4 MWe kapasitesi olan Germencik jeotermal santralinin ekserji verimini hesaplamaktır. Türkiye'nin en büyük jeotermal güç santrali olan ve çift kademeli buhar alma sistemine göre çalışan tesisin performansının değerlendirilmesinde enerji ve ekserji analizi yöntemler kullanıldı. Ekserji analizi, Termodinamiğin birinci ve ikinci yasası ele alınarak her bir ekipman için ve santralin tamamına uygulandı. Çalışmada, santralin gerçek veri değerleri kullanılarak ekserji kayıpları belirlendi ve ekserji akış diyagramı çıkarıldı. Hesaplamalar sırasında ölü hal sıcaklığı 18oC ve ölü hal basıncı 1.012 bar kabul edildi.Tesiste 7 adet üretim kuyusu ve 6 adet reenjeksiyon kuyusu bulunmaktadır. Üretim kuyularından, jeotermal akışkan ortalama 197oC ile 214oC arasındaki sıcaklıklarda, 23 bar ile 30 bar arasında basınçlarda ve 688.8 kg/s debi ile santrale ulaşmaktadır. Bu kuyulardan toplam 134167 kW' lık ekserji girişi olmaktadır. En büyük ekserji girişi ise ÖB-14 kuyusundan 36406 kW olup toplam ekserji girişinin %27.1 karşılık gelmektedir.Santralde meydana gelen başlıca ekserji kayıpları ve bu kayıpların toplam ekserji girişine sırasıyla, vanalarda 4475 kW' lık, %3.34' sine, yüksek ve alçak basınç seperatörlerinde akışkanın ayrıştırma işlemi sırasında 30609 kW 'lık, %22.81' ne, türbin-jeneratör ikilisinde buharın mekanik işe dönüşmesi sırasında 6836 kW' lık, %5.1' e, soğutma kulesinde 12644 kW' lık, %9.42' ne, iç kullanım sırasında 7414 kW' lık, %5.53' üne, reenjeksiyon kuyularında 30452 kW' lık, %22.7' sine karşılık gelmektedir. Ayrıca, türbin-jeneratör ikilisi ve tesisin tamamı için ikinci yasa verimleri sırasıyla %87.4 ve %35.33 olarak bulunmuştur.Bulunan sonuçlar tablo halinde verilip en büyük ekserji kaybının seperatörlerde meydana geldiği belirlenmiştir.

Özet (Çeviri)

The objective of this study is to calculate the efficiency of exegry in Germencik Geothermal Power Plant, which has a capacity of 47.4 MWe. As being the largest one in Turkey, this plant is operated by double flash system which is based on the method of analysis of energy and exergy to evaluate its performance. The exergy analysis has been applied to the whole plant considering the first and the second law of thermodynamics for each equipment. In this study, by using the actual data values the losses of exergy have been determined and the flow diagram of exegry has been illustrated. When making calculations, we have accepted dead state temperature as 18oC, and dead state pressure as 1.012 bars.The plant has 7 production and 6 reinjection wells. From these production wells, geothermal fluid reaches the plant at an average temperature ranging from 194 oC to 214 oC, pressure of 23 bars to 30 bars and a total flow rate of 688.8 kg/s. An exergy input of 134167 kW is obtained from these wells. The largest exergy input of 36406 kW is obtained from OB-14 and this accounts for 27.1% of total exergy input. Moreover, major exergy losses and their exergy input account for 3.34%(4475 kW) for valves, 22.81%(30609 kW) for high and low pressure separation process during the decomposition of geothermal fluid, 5.1%(6836 kW) for turbine-generator during the conversion of steam into mechanic work, 9.42%(12644 kW) for cooling tower, 5.53%(7414 kW) for internal use, and finally 22.7%(30452 kW) for reinejection wells. Additionally, the second law efficency of turbine-generator has been found to be 87.4% and the second law efficiency of overall plant has been found to be 35.33%.The obtained results have been given in tables and the largest loss of exergy has been determined to occur in seperators.

Benzer Tezler

  1. The lifetime extension methods of binary type geothermal power plants

    Bınary tip jeotermal enerji santrallerinde yaşam süresi uzatma methodları

    ELİF DEMİRDAĞ

    Yüksek Lisans

    İngilizce

    İngilizce

    2017

    Enerjiİstanbul Bilgi Üniversitesi

    Enerji Sistemleri Mühendisliği Ana Bilim Dalı

    PROF. DR. ALİ NEZİHİ BİLGE

  2. Zonguldak (Kokaksu) bölgesi boksitlerinden alümina üretim parametrelerinin saptanması ve ekonomik değerlendirilmesi

    The Determination of the parameters of alümina production from the bauxite of Zonguldak (Kokaksu region) and the economic evaluation

    F.GÜNEŞ KOZA

    Doktora

    Türkçe

    Türkçe

    1985

    Kimya Mühendisliğiİstanbul Teknik Üniversitesi

    PROF. DR. H. İBRAHİM ÖZDEMİR

  3. Germencik-Kızılcapınar (Aydın) ve çevresinin hidrojeolojik incelenmesi, sıcak ve soğuk suların jeokimyasal yorumlanması

    Başlık çevirisi yok

    JAFAR REZAZADEH KHAYAT

    Yüksek Lisans

    Türkçe

    Türkçe

    1988

    Jeoloji MühendisliğiDokuz Eylül Üniversitesi

    Jeoloji Ana Bilim Dalı

    DOÇ. DR. ŞEVKİ FİLİZ

  4. Antalya'da depolanmış ürün ve materyalde zararlı böcek ve akar türleri.Yayılışları ve habitatları üzerine araştırmalar.

    Başlık çevirisi yok

    YILDIRIM YANAROĞLU

    Yüksek Lisans

    Türkçe

    Türkçe

    1993

    ZiraatAkdeniz Üniversitesi

    Bitki Koruma Ana Bilim Dalı

    PROF. DR. İRFAN TUNÇ

  5. Sütlerde bazı organikfosforlu pestisitlerin ve bunların süt mamüllerine geçiş oranlarının belirlenmesi üzerine bir araştırma

    Başlık çevirisi yok

    ÜMİT KUTER

    Doktora

    Türkçe

    Türkçe

    1994

    ZiraatEge Üniversitesi

    Süt Teknolojisi Ana Bilim Dalı

    YRD. DOÇ. DR. ERGİN OKTAR