Geri Dön

TKİ-GLİ-Ilgın Linyit İşletmesi ÇG-1 panosunda inklinometre ve manyetik oturma kolon ölçer cihazları ile şev duraysızlığının izlenmesi

Monitoring of slope stable by inclinometer and settlement tube devices of CG-1 panel at TKI-GLI-Ilgin Lignite Operation

  1. Tez No: 286402
  2. Yazar: MURAT MIH
  3. Danışmanlar: DOÇ. DR. İHSAN ÖZKAN
  4. Tez Türü: Yüksek Lisans
  5. Konular: Maden Mühendisliği ve Madencilik, Mining Engineering and Mining
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2011
  8. Dil: Türkçe
  9. Üniversite: Selçuk Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Maden Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Açık ocak madenciliğinde ekonomi ve işletme güvenliği açısından şev tasarımı önemli bir yer tutmaktadır. Şev duraysızlığı can ve mal kayıplarına neden olabilmektedir. Açık ocak madenciliği sırasında şevin sürekli izlenmesi gerekir. Bu projenin planlandığı gibi sürdürülmesi için zorunludur.Bu tez çalışmasında, TKİ-GLI-Ilgın Linyit İşletmesi maden ocağı doğu şevinde görülen şev duraysızlığı yerinde ölçümlerle izlenmiştir. Şevde iki ayrı sondaj kuyusu yerinde ölçümler için açılmıştır. Yatay ve düşey deformasyonlar 7 ay boyunca sondaj kuyuları kullanılarak izlenmiştir. Saha ölçümleri inklinometre ve manyetik kolon ölçerler yardımıyla gerçekleştirilmiştir. Sahada ayrıca aynı zaman süresince jeodezik ölçümler yapılmıştır. Ayrıca kaya malzemesi ve kaya kütle davranışını belirlemek amacıyla bazı kaya mekaniği deneyleri yapılmıştır.Ölçüm kuyularının Güney-Batı yönünde hareket ettiği belirlenmiştir. Bir başka değişle şevde ölçülen deformasyonların maden ocağının dip noktasına doğru olduğu anlaşılmıştır. Kuyuların 5. metresinde ölçülen en büyük deformasyonun yaklaşık 5-10 mm olduğu belirlenmiştir. Kuyuların bu noktalarından geçen bir dairesel kayma düzleminin olduğu tespit edilmiştir. Şev için ayrıca bu çalışmada duraylılık analizleri de yapılmıştır. Görgül analizler sonucunda güvenlik katsayısının 1 den az olduğu (F < 1) yanı şevin güvenli olmadığı belirlenmiştir. Görgül analizler yanında PHASE2 yardımıyla sayısal çözümleme yapılmıştır. Sayısal analiz sonucunda şevde dairesel kayma düzleminin olduğu ve şevin yenildiği anlaşılmıştır. Yerinde ölçüm sonuçları ile sayısal çözümleme sonuçlarının örtüştüğü ancak PHASE2 programının ön gördüğü deformasyonların daha yüksek olduğu belirlenmiştir.

Özet (Çeviri)

The slope design for economic and operational safety in open-pit mining is very important. The unstability which is seen in slope can cause loss of life and property. During open pit mining must be continuous monitoring of the slope. It is necessary to sustain the project as planned.In this thesis, the slope unstability seen in the eastern slope of the TKI-GLI-Ilgin lignite open-pit mine was monitored by in-situ measurements. Two bore holes were drilled for in-situ measuring. The horizontal and vertical deformations using in-situ bore holes measuring have been followed for 7 months. The field measurements were carried out by inclinometer and magnetic tube probes. During the same measuring time, geodetic measurements from bore holes were also made. In addition, to determine rock material and rock mass behavior, some rock mechanical tests were carried out in mine field.It was determined that both bore holes were moved toward to South-West direction. In order words, the deformations measured in slope were towards bottom level of open-pit mine. It was noticed that the maximum deformation measured in bore holes were formed as approximately 5-10 mm in fifth meters of both bore holes. These points in the plane of the bore holes were found to be a circular shift. Slope stability analyses for this study also have been made. As a result of empirical analysis of the security coefficient is less than 1 (F <1), as well slope was determined to be unsafe. In addition, Numerical analysis is made with the help of PHASE2. As a result of the numerical analysis, it was noticed that the circular slip plane was failured. On-site measurement results coincide with the results of numerical analysis, but determined that the deformations predicted by PHASE2 program were higher than in-situ measurement.

Benzer Tezler

  1. Development of a firm level total factor productivity measurement in coal mining

    Kömür madenciliğinde firma düzeyinde toplam faktör verimliliği ölçümünün geliştirilmesi

    SERDAR AKINCI

    Yüksek Lisans

    İngilizce

    İngilizce

    1992

    Maden Mühendisliği ve MadencilikOrta Doğu Teknik Üniversitesi

    DOÇ. DR. NEŞE ÇELEBİ

  2. A simple resource-aware approach to sketch recognizers via style identification

    Stil tanıma yoluyla zamandan kazanımlı çizim tanıma sistemleri geliştirme

    BURAK ÖZEN

    Yüksek Lisans

    İngilizce

    İngilizce

    2013

    Bilgisayar Mühendisliği Bilimleri-Bilgisayar ve KontrolKoç Üniversitesi

    Bilgisayar Mühendisliği Ana Bilim Dalı

    YRD. DOÇ. DR. TEVFİK METİN SEZGİN

  3. Hegel'in fenomenolojisinin bilgikuramsal temelleri

    Başlık çevirisi yok

    UFUK YALTIRAKLI

    Doktora

    Türkçe

    Türkçe

    1987

    Felsefeİstanbul Üniversitesi

    Mantık Ana Bilim Dalı

    DOÇ. DR. ULUĞ NUTKU

  4. Spin-orbit coupled fermi gases under adiabatic rotation

    Adyabatik dönen spin-momentum bağlı fermi gazlar

    ENİS DOKO

    Doktora

    İngilizce

    İngilizce

    2016

    Fizik ve Fizik MühendisliğiKoç Üniversitesi

    Fizik Ana Bilim Dalı

    DOÇ. DR. MENDERES IŞKIN

  5. Farabi'de determinizm

    Başlık çevirisi yok

    RAHMİ KARAKUŞ

    Yüksek Lisans

    Türkçe

    Türkçe

    1987

    Felsefeİstanbul Üniversitesi

    Türk-İslam Düşüncesi Tarihi Ana Bilim Dalı

    PROF. DR. NİHAT KEKLİK