Computer model for CPM scheduling of repetitive networks

Başlık çevirisi mevcut değil.

  1. Tez No: 2683
  2. Yazar: NİHAT TORUMTAY
  3. Danışmanlar: ENGİN ERANT
  4. Tez Türü: Yüksek Lisans
  5. Konular: İnşaat Mühendisliği, Civil Engineering
  6. Anahtar Kelimeler: Ağ-diyagramları, Tekrar eden Ag- diyagraraları, Proje planlaması, CPM vı, Network planning, Repetitive networks, Project planning, CPM IV
  7. Yıl: 1987
  8. Dil: İngilizce
  9. Üniversite: Orta Doğu Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Belirtilmemiş.
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

ÖZET SÜREKLİ TEKRAR EDEN A&-DIYAGRAMLARINDA BİLGİSAYAR İLE KRİTİK YOL METODU (CPM) PLANLAMA MODELİ TORUMTAY, Nihat Yüksek Lisans Tezi - İnş. Müh. Bölümü Tez Yöneticisi : Ögr. Gor. Engin Erant Yrd. Tez Yöneticisi.- Ögr. GÖr. Erkan Şahmalı Aralik 1987, 93 sayfa Ag-diyagramları ve CPM uygulaması birçok proje alaninda, ve sürekli tekrar eden aktivitelerin analizlerinde yaygınlaşmıştır. CPM uygulamalarında mevcut bilgisayar programları sayica ve nitelikleri bakımından sürekli artmaktadır. Mevcut bilgisayar programlarının birçok olanaklara sahip olmasına rağmen sürekli tekrarı olan projelerde geniş kapsamlı ağ-diyagramlarının hazırlanışı ve çok sayıda verinin bilgisayara yüklenmesi, zaman kaybına neden olan bir problemdir. Bu tezde, sürekli tekrarı olan projelerin CPM ile planlanmasını sağlayan bir bilgisayar programı önerilmiştir.Önerilen model, veri olarak tek bir temel ağ-diyagramından yararlanarak, projenin tamamını kapsayan bir ağ-diyagramı yaratmakta ve bu diyagramı CPM tekniği ile planlamaktadır. Temel ağ-diyagrami, aktiviteler arası ilişkileri ve tekrarlar arasi ilişkileri belirleyen parametreler içermektedir. Ağ-diyagramlarının genel bir incelemesi ve CPM tekniği, tezin ikinci bölümünde yer almaktadır. Önerilen modelin tanimı ve özellikleri üçüncü bölümde, bir proje uygulaması dördüncü bolümde, sonuç beşinci bölümde, ve gelecekte yapilabilecek çalışmalar altıncı bölümde yer almaktadır.

Özet (Çeviri)

ABSTRACT COMPUTER MODEL FOR CPM SCHEDULING OF REPETITIVE NETWORKS TORUMTAY, Nihat M.S. in Civil Eng. Department Supervisor : Inst. Engin Erant Co-supervisor : Inst. Erkan Sahmali December, 1987, 93 pages The applications of Critical Path Method have expanded to virtually every type of project. It has also been applied to the detailed analyses of repetitive tasks. The computer programs available for CPM processing have continued to increase in number and in variety. Although the programs utilized many capabilities, the preparation of large scale networks and inputting of enormous amount of data for large repetitive networks, is a time consuming problem. In this study, a computer model is proposed for CPM scheduling of repetitive networks. The model generates a network of required repetitions with a given core-network of one repetition, and schedules the activities using CPM technique. Core-network consists of several parameters which implies interrelationships among activities. iiiIn the second chapter of the thesis, network approach to planning is viewed in general and technique of CPM is described. The proposed computer model is described in the third chapter and an implementation of a case is demonstrated in the fourth chapter. Conclusion section is in the fifth chapter and recommendations section takes place in the sixth chapter of the study.

Benzer Tezler

  1. An Elastic timing method proposed for construction schedules

    İş programları için önerilen esnek zamanlama metodu

    AYŞE SİBEL YANIKÖMEROĞLU

    Yüksek Lisans

    İngilizce

    İngilizce

    1992

    İnşaat MühendisliğiOrta Doğu Teknik Üniversitesi

    YRD. DOÇ. DR. MUSTAFA TALAT BİRGÖNÜL

  2. Construction scheduling with limited resources based on the PBS technique

    Başlık çevirisi yok

    SALİH BEHZAT ETHEM

    Yüksek Lisans

    İngilizce

    İngilizce

    1991

    MimarlıkOrta Doğu Teknik Üniversitesi

    PROF.DR. MUSTAFA PULTAR

  3. CPM/PERT ile proje planlama ve kontrol

    Project planning and controlling by CPM/PERT

    YEŞİM ALP

    Yüksek Lisans

    Türkçe

    Türkçe

    1993

    İşletmeİstanbul Teknik Üniversitesi

    PROF.DR. AYHAN TORAMAN

  4. Kaynak kısıtlı proje programlama problemlerinin çözümü için yeni yöntem ve algoritmalar

    New methods and algorithms for solving the resource-constrained project scheduling problem

    İHSAN UĞUR

    Doktora

    Türkçe

    Türkçe

    1987

    İşletmeİstanbul Teknik Üniversitesi

    PROF.DR. ATAÇ SOYSAL