Geri Dön

Emet borik asit fabrikası atıklarından borun kazanılması

Recovering of boron from emet boric acid factory's wastes

  1. Tez No: 202845
  2. Yazar: ERSİN BÜYÜKYILDIZ
  3. Danışmanlar: PROF. DR. YUNUS ERDOĞAN
  4. Tez Türü: Yüksek Lisans
  5. Konular: Kimya, Chemistry
  6. Anahtar Kelimeler: Atık Barajı, Bor'un Kazanılması, Kalsinasyon, Kolemanit, Tailing Pond, Recovering of Boron, Calcination, Colemanite
  7. Yıl: 2007
  8. Dil: Türkçe
  9. Üniversite: Dumlupınar Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Kimya Ana Bilim Dalı
  12. Bilim Dalı: Analitik Kimya Bilim Dalı
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Bor, Türkiye'nin sahip oldugu çok önemli endüstriyel hammaddelerinden biridir. Ülkemiz, gerek bor minerallerinin sahip oldugu rezerv büyüklügü, niteligi ve çesitliligi açısından, gerekse isletme maliyeti ve tenör avantajları ile dünyada birinci sırada bulunmaktadır. Bunun yanı sıra, Türkiye'de bor konsantresi üretiminde kullanılan kırma, yıkama, sınıflandırma ve triyaj gibi zenginlestirme islemleri esnasında önemli miktarlarda atık çıkmaktadır. Bu atıkların degerlendirilmesi hem dogal kaynakların maksimum düzeyde kullanılması, hem stoklanması hem de çevre açısından önem arz etmektedir. Eti Maden sletmeleri Genel Müdürlügü Emet Bor sletme Müdürlügüne baglı Hisarcık ve Espey Konsantratör Tesisleri bünyesinde üretilmekte olan kolemanit cevheri, isletme bünyesinde bulunan Emet Borik Asit Fabrikası'nda borik asit üretiminde kullanılmaktadır. Ancak, konsantre kolemanit üretim islemi esnasında önemli miktarda su kullanılmakta, sonuçta ortaya sulu atık çıkmakta ve bu atıklar ancak atık barajlarında depolanmaktadır. Bu çalısmada, Emet Borik Asit Fabrikası atıklarından bor'un geri kazanılması amaçlanmıstır. Bunun için Emet Borik Asit Fabrikası atıklarından olan Hisarcık Eski Atık Barajı'ndan alınan kolemanit numuneleri kullanılarak çalısmalar yapılmıstır. Emet-Hisarcık Eski Atık Barajından temin edilen katı atıgın tanımlanmasından sonra bor'un kazanılması için kalsinasyon islemi yapılmıstır. Deneyde kalsinasyon islemine sıcaklık, süre ve eleme parametrelerinin etkisi incelenmistir. Sonuçta, sıcaklık, süre ve farklı eleklerden elemenin kalsinasyon islemi ile bor'un kazanılmasında etkili oldugu belirlenmistir. Laboratuar tipi fırında 350-500oC sıcaklık ve 15?60 dakikalık süreler arasında kalsinasyon islemi gerçeklestirilerek kalsine ürün elde edilmistir. Daha sonra 0,25 mm. ve 0,50 mm. eleklerden kalsine kolemanitin kilden ayrılmasına yönelik çalısmalar yapılmıstır. Böylece Hisarcık Eski Atık Barajındaki kolemanit atıgından kalsine kolemanit üretimi gerçeklestirilmistir. Laboratuar ölçekli testlerin sonucunda, 450oC sıcaklık ve 25 dakika süre sonunda 0,50 mm elekten elemede %30,52 B2O3 tenörü ve %92,96 B2O3 kurtarma verimi ile kalsine konsantre üretimi yapılabilecegi görülmüstür.

Özet (Çeviri)

Boron is one of the most important and valuable industrial raw material of Turkey. With the quantity, quality and kind of boron mineral reserves and cheap production cost and advantage of B2O3 contents, Turkey has the first place in the world. In spite of this, during beneficiation processes like crushing, washing, classification and triage used for boron concentrate in Turkey, considerable amounts of tailings are accumulated. Evaluation of this tailing is important for both maximum usage of reserves, stockpiling and for the environment aspects. Colemanite ore produced in Espey and Hisarcık Concentrator Plants depending on Emet Boron Works of Eti Mine Works General Management is used in Boric acid production in Emet Boric Acid Factory in the same plant. But, during production of concentrate colemanite, considerable amounts of water is to use, in this result, tailings with water are accumulated outside and these tailings are stored in only waste ponds. In this study, it was aimed to recover of Boron from Emet Boric Acid Factory?s solid wastes. For this aim, it was studied on solid colemanite samples collected from Emet-Hisarcık Old Waste Pond. For recovering of boron after determination of the Emet Hisarcık Old Waste Pond?s solid wastes, calcination was applied on them. Effect of time, temperature and sifting on calcination was investigated in experiment. According to the experimental test result, it was determined that time, temperature and sifting with different screens affect the calcination. Calcination was performed in laboratory type furnaces between 350-500oC and 15-60 minutes and calcined colemanite was produced. And then calcined colemanite was separated from the clay by sifting with 0,25 mm and 0,50 mm screens. As a result, it was aimed to produce calcined colemanite from Emet- Hisarcık Old Waste Pond?s solid colemanite wastes. As the result of the laboratory scaled experiments, by calcining at 450oC in 25 minutes, and by sifting with 0,50 mm screen, calcined product with a grade of 30,52% B2O3 and with 92,96% efficiency is obtained.

Benzer Tezler

  1. Bor tuzlarının çevre üzerindeki etkileri Emet Bor İşletme Müdürlüğü konsantratör tesisleri ve Emet Borik Asit Fabrikası

    Effect of boron minerals on environment Emet boron enterpreses mineral processing plants and model of Emet Boric Asid plant

    MEMİŞ ÜLKER ÜNLÜ

    Yüksek Lisans

    Türkçe

    Türkçe

    2004

    Çevre MühendisliğiGazi Üniversitesi

    Çevre Bilimleri Ana Bilim Dalı

    DOÇ.DR. METİN GÜRÜ

  2. Emet Borik Asit Fabrikası atıklarının arpa ve buğday bitkilerinde çimlenme ve vejetatif büyüme üzerine etkileri

    The effects of Emet Boric Acid Factory wastes on barley and wheat germination and vegetative growth

    AYTEN EROĞLU

    Yüksek Lisans

    Türkçe

    Türkçe

    2006

    BiyolojiDumlupınar Üniversitesi

    Biyoloji Ana Bilim Dalı

    Y.DOÇ.DR. SÜLEYMAN TOPAL

  3. Endüstriyel katı atıklar-katı atık yönetimi ve Emet Borik Asit Üretim Tesisi katı atıklarının bertarafı

    Industrial solid waste-solid waste management and disposal of the Emet Boric Acid Factory process solid waste

    BİROL KAYRANLI

    Yüksek Lisans

    Türkçe

    Türkçe

    2001

    Çevre MühendisliğiGazi Üniversitesi

    Çevre Bilimleri Ana Bilim Dalı

    PROF. DR. SÜLEYMAN PAMPAL

  4. Dissolution of colemanite and crystallization of gypsum during boric acid production in a batch reactor

    Kesikli reaktörde borik asit üretimi esnasında kolemanit çözünmesi ve jips kristalizasyonu

    ANIL ERDOĞDU

    Yüksek Lisans

    İngilizce

    İngilizce

    2004

    Kimya MühendisliğiOrta Doğu Teknik Üniversitesi

    Kimya Mühendisliği Ana Bilim Dalı

    PROF. DR. İNCİ EROĞLU

  5. Emet bölgesindeki arsenik mineralleri içeren kolemanit cevherlerinin zenginleştirilebilirliğinin araştırılması

    Investigation of mineral processing of colemanite ore including arsenic minerals in the Emet region

    AKIN DUBAN

    Yüksek Lisans

    Türkçe

    Türkçe

    2004

    Maden Mühendisliği ve Madencilikİstanbul Üniversitesi

    DOÇ. DR. ENVER ÜLGER