Geri Dön

Elazığ ili Gözeli mikro havzasında ağaçlandırma işlerine ilişkin iş analizleri ve standart zamanlar

The standard times and work analysis about afforestation works at Gözeli micro region of Elazığ city

  1. Tez No: 112302
  2. Yazar: NECATİ ÇOK
  3. Danışmanlar: PROF. DR. ORHAN ERDAŞ
  4. Tez Türü: Yüksek Lisans
  5. Konular: Ormancılık ve Orman Mühendisliği, Forestry and Forest Engineering
  6. Anahtar Kelimeler: Ağaçlandırma, Standart Zaman, Birim Zaman, Elazığ, İş analizi, Afforestation, Standard Time, The Unit Time. II, Elazığ, Job analysis
  7. Yıl: 2001
  8. Dil: Türkçe
  9. Üniversite: Kahramanmaraş Sütçü İmam Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Orman Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

ÖZET Necati ÇOK ÖZET YÜKSEK LİSANS TEZİ ELAZIĞ İLİ GÖZELİ MİKRO HAVZASINDA AĞAÇLANDIRMA İŞLERİNE İLİŞKİN İŞ ANALİZLERİ VE STANDART ZAMANLAR NECATİ ÇOK KSÜ FEN BİLİMLERİ ENSTİTÜSÜ ORMAN MÜHENDİSLİĞİ ANABİLİM DALI Danışman: Prof. Dr. Orhan ERDAŞ Yıl: 2001, Sayfa: 96 Jüri Prof. Dr. Orhan ERDAŞ Prof. Dr. Musa GENÇ Yrd. Doç. Dr. Mahmut D. AVŞAR Elazığ yöresinde en düşük maliyetle gerçekleştirmeyi sağlayan ağaçlandırma işlemlerinin bilinmesine ve ağaçlandırma yatırım projelerinin ekonomik analizlerinde gerekli maliyet verilerinin sağlamasına ihtiyaç vardır. Bu nedenle bu araştırma ile Elazığ yöresinde ağaçlandırma çalışmalarına ait, iş ölçümlerinin yapılması ve standart zamanların saptanması amaçlanmıştır. Arazi çalışmaları, Elazığ ili Gözeli Mikro Havzası'nda yürütülmüştür. Eğim ve taşlılık etmenlerine bağlı olarak hesaplanan bu standart zamanların maksimum ve minimum değerleri şöyledir: Ocak ekimi işi için nitelikli bir işçi ile bir iş gününde, orta-hafîf bünyeli topraklarda 550 - 631 adet ocak ve ağır bünyeli topraklarda 467 - 542 adet ocak yapılmaktadır. Normal gradon i tipi devamlı teras yapımı işi için nitelikli bir işçi ile bir iş gününde, orta-hafif bünyeli topraklarda 48.93 - 65.45 metre teras ve ağır bünyeli topraklarda 39.83 - 49.47 metre teras yapılmaktadır. Çıplak köklü ibreli fidan dikimi işi için, nitelikli bir işçi ile bir iş gününde orta-hafif bünyeli topraklarda 104 - 151 adet; ağır bünyeli topraklarda 75 - 120 adet fidan dikilebilmektedir. Fidan çevresinde ot alma-çapa işi için, nitelikli bir işçi ile bir iş gününde, ot yoğunluğu % 0 - 40 olan sahalarda 165 - 230 adet; ot yoğunluğu % 41 ve daha fazla olan sahalarda 128 - 198 adet fidan için çalışma yapılabilmektedir. Fidan sıraları boyunca fidanlar çevresinde ot alma ve çapa işi için, nitelikli bir işçi ile bir iş gününde, ot yoğunluğu % 0 - 40 olan sahalarda 141 - 192 metre ve ot yoğunluğu % 41 ve daha fazla olan sahalarda 116 - 165 metrelik çalışma yapılmaktadır. Bu araştırmada bulunan değerler ile bu konuda yapılan diğer araştırmalara ait sonuçlar arasında farklılıklar mevcuttur.

Özet (Çeviri)

ABSTRACT Necati ÇOK ABSTRACT HIGH LCIENCE THEIS THE STANDARD TIMES ANDWORK ANALYSIS ABOUT AFFORESTATION WORKS AT GÖZELİ MICRO REGION OF ELAZI? CITY Necati ÇOK KSU SCIENCE INSTITUE THE MAIN SCIENCE BRANCH OF FOREST ENGINEERING Advisor: Prof. Dr. Orhan ERDAŞ Year: 2001, Page: 96 Jury : Prof. Dr. Orhan ERDAŞ : Prof. Dr. Musa GENÇ : Yrd. Doç. Dr. Mahmut D. AVŞAR There is need satisfing of necessary cost datums at economic analysis of afforestation deposit projects and there is need the knowing of procedure of afforestation which satisfies the lowest cost materalizing at Elazığ suburb. That's why, it is intended to fixed standard times and te do measures of work about afforestation works at Elazığ suburb with this work. Fields works were continued at Gözeli micro area of Elazığ city. According to slope and stony place, the maximum and minimum values of these standard times are here: It is established that a quality worker for January planting at middle- light structure earth is 550 - 632 units furnace and heavy-structure earth is 467 - 542 units furnace it's established that a quality worker for the type of normal gradon i with making of continues terrace at middle-light structure earth is 48.93 - 65.45 meter terrace and at heavy structure earth is 39.83 - 48.47 meter terrace. It's established that a quality worker. With one workday for naked root at middle-light structure earth is 104 - 151 units young tree and it is established that a quality worker with one workday for naked root at heavy-structure earth is 75 - 120 units young tree. It's established that a quality worker for clearing of refuse of plants at around young trees at are which plants density is % 0 - 40 is 165 - 230 units youag tree and it's established that a quality worker for clearing of refuse around young trees at area which density of plant is % 0 - 40 is 141 - 192 meter and it is established that a quality worker at a workday for clearing of refuse around young trees at area which density of plant is % 40 is 116 - 165 meter. Different values that were found and the other research results were done about this subject. The

Benzer Tezler

  1. Elazığ ili su kenelerinin (Hydrachnellae, acari) sistematik yönden incelenmesi

    Başlık çevirisi yok

    ORHAN ERMAN

    Doktora

    Türkçe

    Türkçe

    1990

    ZoolojiAtatürk Üniversitesi

    Biyoloji Ana Bilim Dalı

    PROF.DR. MUHLİS ÖZKAN

  2. Elazığ ili merkez ilçesi, orman bölge müdürlüğü lojmanlarındaki sosyal ilişkiler

    Başlık çevirisi yok

    İLKNUR ÖNER

    Yüksek Lisans

    Türkçe

    Türkçe

    1990

    SosyolojiFırat Üniversitesi

    Sosyoloji Ana Bilim Dalı

    PROF.DR. ZEKİ ERDOĞMUŞ

  3. Elazığ ili orta dereceli okullarında ceza ve ödül 1977-1988

    Başlık çevirisi yok

    A.MÜJGAN ŞENUYAR

    Yüksek Lisans

    Türkçe

    Türkçe

    1989

    Eğitim ve ÖğretimFırat Üniversitesi

    PROF.DR. KEMAL GÜÇLÜOL

  4. Elazığ ili merkez ve çevresinde akraba evlilikleri insidansı ve tıbbi sonuçları

    Başlık çevirisi yok

    CÜNEYT TÜZÜN

    Tıpta Uzmanlık

    Türkçe

    Türkçe

    1992

    Tıbbi BiyolojiFırat Üniversitesi

    Tıbbi Biyoloji Ana Bilim Dalı

  5. Elazığ İli kent içi otoparkları üzerine bir araştırma

    A Research on the inner city parking lots of Elazığ

    ÖNER GÜNEŞ

    Yüksek Lisans

    Türkçe

    Türkçe

    1994

    İnşaat MühendisliğiFırat Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    PROF. BEKİR YILDIRIM