Geri Dön

Bir altın ve gümüş madeni açık ocağındaki kazıyıcı-yükleyicilerin performans analizi

Performance analysis of excavators-loaders in a gold and silver open pit

  1. Tez No: 1007216
  2. Yazar: ARDA ÇELİK
  3. Danışmanlar: PROF. DR. HAMDİ AKÇAKOCA
  4. Tez Türü: Yüksek Lisans
  5. Konular: Maden Mühendisliği ve Madencilik, Mining Engineering and Mining
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2026
  8. Dil: Türkçe
  9. Üniversite: Eskişehir Osmangazi Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Maden Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Maden İşletme Bilim Dalı
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Bu çalışma, bir açık ocak altın ve gümüş madeni işletmesinde kullanılan kazıcıyükleyici ekipmanların operasyonel performansının değerlendirilmesini amaçlamıştır. Açık ocak madenciliğinde üretim sürecinin sürekliliği ve verimliliği, kazı-yükleme faaliyetlerinin etkin biçimde yürütülmesine doğrudan bağlıdır. Bu nedenle çalışmada kazıcı-yükleyici ekipmanların yükleme çevrim süreleri, vardiya koşulları, yükleme lokasyonları ve kamyonkazıcı eşleşmeleri gibi parametreler performans analizlerinde irdelenmiştir. Araştırmada kullanılan veriler, işletmede aktif olarak kullanılan bilgisayarlı filo yönetim ve sevk (dispatch) sisteminden elde edilmiştir. Dört aylık süre boyunca kaydedilen çok sayıda yükleme çevrimine ait veriler değerlendirilmiş ve gerçek saha koşullarını yansıtan geniş ölçekli bir veri seti oluşturulmuştur. Elde edilen veriler yardımıyla kazıcıyükleyici ekipmanların ortalama yükleme süreleri, üretkenlik düzeyleri ve duruş süreleri belirlenmiş; bu değişkenlerin ekipmanların performansları üzerindeki etkileri analiz edilirken değerlendirilmiştir. Performans analizleri sonucunda, kazıcı-yükleyici modeline, yükleme yapılan ocak içi konumun fiziksel özelliklerine ve kamyon tipine bağlı olarak yükleme çevrim sürelerinde anlamlı farklılıklar olduğu tespit edilmiştir. Ayrıca vardiya koşulları ve ekipman-kamyon uyumu, üretim sürekliliği ve ekipman verimliliği üzerinde belirleyici faktörler olarak öne çıkmıştır. İncelenen veriler doğrultusunda üretken olmayan sürelerin başlıca nedenleri ortaya konmuş ve ekipman performansını doğrudan etkileyen operasyonel aksaklıklar belirlenmiştir. Elde edilen bulgular, kazıcı-yükleyici ekipmanların performansının düzenli olarak izlenmesinin; üretim planlamasının iyileştirilmesi, duruş sürelerinin azaltılması ve açık ocak işletmelerinde genel üretim verimliliğinin artırılması açısından önemli olduğunu göstermektedir. Çalışma sonucunda, mevcut sistemde performans kaybına neden olan unsurlar belirlenmiş ve ekipman kullanım etkinliğini artırmaya yönelik iyileştirme önerileri sunulmuştur.

Özet (Çeviri)

This study aims to evaluate the operational performance of excavator–loader equipment used in an open-pit gold and silver mining operation. In open-pit mining, the continuity and efficiency of the production process directly depend on the effective execution of excavation and loading activities. Therefore, in this study, parameters such as the loading cycle times of excavator-loader equipment, shift conditions, loading locations, and truck–excavator matching were examined in performance analyses. The data used in the research were obtained from the computerized fleet management and dispatch system actively utilized in the operation. A large-scale dataset reflecting real field conditions was constructed by evaluating numerous loading cycle records collected over a four-month period. With the help of the obtained data, the average loading times, productivity levels, and downtime durations of the excavator-loader equipment were determined; these variables were evaluated while analyzing their effects on the performance of the equipment. The results of the performance analyses revealed that loading cycle times differ significantly depending on the excavator–loader model, the physical characteristics of the in-pit loading location, and the type of truck being loaded. In addition, shift conditions and equipment–truck compatibility were identified as key factors affecting production continuity and equipment efficiency. Based on the examined data, the main causes of non-productive times were identified, and operational disruptions directly influencing equipment performance were determined. The findings indicate that regular monitoring of excavator–loader performance is essential for improving production planning, reducing downtime durations, and increasing overall production efficiency in open-pit mining operations. As a result of the study, the factors causing performance losses in the current system were identified, and improvement recommendations were presented to enhance equipment utilization efficiency.

Benzer Tezler

  1. Bir altın ve gümüş madeni açık ocağında,kullanılan nakliyat kamyonlarının yakıt sarfiyatları ve yük miktarlarının İPK yöntemiyle değerlendirilmesi

    Evaluation of fuel consumption and load amounts of transport trucks used in a gold and silver open pit mine using the IPC method

    ALİ DÖKEN

    Yüksek Lisans

    Türkçe

    Türkçe

    2026

    Maden Mühendisliği ve MadencilikEskişehir Osmangazi Üniversitesi

    Maden Mühendisliği Ana Bilim Dalı

    PROF. DR. HAMDİ AKÇAKOCA

  2. Kiziltepe low-sulphidation epithermal deposit (Sindirgi, Balikesir): An example for relay-ramp-hosted epithermal gold mineralization in Western Turkey

    Kızıltepe düşük sülfidasyon altın yataği (Sındırgı, Balikesir): Aktarim yokuşuna yerleşmiş epitermal altın cevherleşmesine Bati Anadolu'dan bir örnek

    BERKİN UĞURLU

    Yüksek Lisans

    İngilizce

    İngilizce

    2019

    Jeoloji MühendisliğiOrta Doğu Teknik Üniversitesi

    Jeoloji Mühendisliği Ana Bilim Dalı

    PROF. DR. ERDİN BOZKURT

  3. Siirt – Madenköy açık işletme sahasında gerçekleşen kütle hareketleri ile bölgesel yağış ilişkisinin saptanması

    Determining the relationship between mass movements occurred in Siirt – Madenkoy open mining site and regional precipitation

    DENİZ DOLMA

    Yüksek Lisans

    Türkçe

    Türkçe

    2023

    Jeoloji Mühendisliğiİstanbul Teknik Üniversitesi

    Jeoloji Mühendisliği Ana Bilim Dalı

    DOÇ. DR. ENVER VURAL YAVUZ

  4. Burdur ili mermer sektörünün kurumsal ve ekonomik yapısı

    İnstitutional and economic structure of marble sector in burdur

    AHMET SARITAŞ

    Yüksek Lisans

    Türkçe

    Türkçe

    2006

    EkonomiAkdeniz Üniversitesi

    İşletme Ana Bilim Dalı

    PROF.DR. AYŞE KURUÜZÜM

  5. Tarihi gelişimi içinde Türkiye'de izlenen kur politikası

    Başlık çevirisi yok

    EMİNE KILAVUZ

    Yüksek Lisans

    Türkçe

    Türkçe

    1989

    EkonomiErciyes Üniversitesi